23398
N/AClare - Clare County Council
Proposed Development
for the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
13 Jul 2023
Further information requested
5 Sept 2023
Application withdrawn
6 Mar 2024
Application Details
- Location
- Knockanean , Ennis , Co Clare
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Clare County Council
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 13 July 2023
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 6 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Knockanean , Ennis , Co Clare
for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Knockanean , Ennis , Co. Clare
a)RETENTION permission to retain the completed renovations and extension to the existing dwelling house and b) Planning permission to upgrade existing waste water treatment system including all site works.
Knockanean , Ennis , Co. Clare
to construct a dwelling house and private garage. The development will include connection to the public sewer and water services, utilisation of existing entrance on to the Knockaneen Road and all ancillary site works
Knockaneen , Ennis , Co Clare
the development will consist of the construction of 13 no detached dwelling houses including for all site development works, site landscaping and public service connections, some of which have been substantially completed under previous permissions granted on this site under Planning Ref P06-21019 and extended under Planning ref P11-21073. The development includes for the provision of a pedestrian access (including footbridge) from the application site to the existing Gort Leamhan residential development. the proposed development also includes the completion of provision of on-street public lighting on the public road at this location. The Planning application is accompanied by a Natura Impact Statement
Knockanean , Ennis , Co Clare
for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Knockaskibbole , Doora , Co. Clare
to extend the existing dwelling house to the rear to provide a new kitchen/dining area and to the side to provide an attached Granny Flat & all other associated site and ancillary works
Cloonawee , Knockanean , Co. Clare
to construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all with associated site works
Knockaskibbole , Doora , Co Clare
for an amendment to the granted Planning Permission (P20/158) for development which will consist of 1) Roof design amendments to the 3 granted on site bungalows house Type A, numbered 1,2 and 3, as granted under planning permission P20/158. 2) House design changes to all other units previously granted, numbered 4-21. The road layout and access arrangements to remain as previously granted under planning permission P20/158
Millbank , Roslevan , Ennis Co Clare
for development which will consist of: 1) Omission of 3 number blocks of semi-detached houses numbered B04 to B09 as previously granted under planning reference P20-158. 2) Inclusion of 5 number blocks of semi-detached houses in lieu of units omitted and amendments to the house design in accordance with house type designs submitted this application. The road layout, access arrangements and boundary treatments to remain as previously granted planning permission under P20.158
Millbank Roslevan , Tulla Rd , Ennis Co Clare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?