2341762
CONDITIONALCork - Cork City Council
Proposed Development
For planning permission. The development will consist of 1137m2 (450 No.) of roof mounted Solar PV Panels across 3 structures and 270m2 (112 no.) of ground mounted Solar PV Panels, at our premises.
View the full application file on the council's planning portal →Application Timeline
Application received
3 Feb 2023
Decision due
8 May 2023
Decision: CONDITIONAL
8 May 2023
Grant issued
19 Jun 2023
Application Details
- Location
- Brughor House , Lehenaghmore , Togher
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 3 February 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 May 2023
- Grant Date
- 19 June 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission with revised plans for a development previously granted permission under F/N 23/41762. The development will consist if 216.14kWp c.1020m2 (428 no.) of roof mounted Solar PV panels on one structure where 278 Solar PV panels were previously planned, at our premises.
Lehenaghmore , Togher , Cork
Permission with revised plans for a development previously granted permission under F/N 23/41762. The development will consist of 216.14kWp c.1020m2 (428 no.) of roof mounted Solar PV panels on one structure where 278 Solar PV panels were previously planned, at our premises.
Lehenaghmore , Togher , Cork
Retention of modifications to an existing light industrial development [constructed on foot of Planning Reg. No. 90/459] comprising (i) enclosure of open store with partition wall in southern section at first floor level, (ii) omission of open store stair access from ground floor manufacturing area, (iii) provision of alternative stair access on southern wall, and (iv) modifications and subdivision of floor space to provide for changing rooms, storage area and canteen. Permission is also sought for further internal modifications to the southern section at first floor level comprising relocation of stairs, provision of staff toilets/showers, circulation, storage, and meeting room space at their light industrial facility.
Lehenagh More , Togher , Co. Cork
Alterations to northern elevation to include removal of 1 no. roller door, provision of new entrance door complete with glass canopy, new ground and first floor windows and replacement signage;(ii) alterations to eastern elevation to include emergency exit, new ground and first floor windows: (iii) internal layout modifications comprising reconfiguration and refurbishment of back office and staff facilities at ground floor levels to include office and meeting spaces, toilets, elevator for disabled access, changing and canteen areas; (iv)installation of access hatch, fall arrest system and replacement of existing rooflights at roof level; (v) modifications to external services yard and parking areas to include new entrance to staff car park from the northeast, closure of vehicular linkage between the service yard and staff car park, reconfiguration of visitor car parking to northeast; (vi) removal of existing septic tank and installation of new sewage treatment system, and all associated ancillary development works, including landscaping at their light industrial facility.
Lehenagh More , Togher , Cork
Alterations to northern elevation to include removal of 1 No. Roller door, provision of new entrance door complete with glass canopy, new ground and first floor windows, and replacement signage; (ii) alterations to eastern elevation to include emergency exit, new ground and first floor windows; (iii) internal layout modifications comprising reconfiguration and refurbishment of back office and staff facilities at ground and first floor levels to include office and meeting spaces, toilets, elevator for disabled access, changing and canteen areas; (iv) installation of access hatch, fall arrest system and replacement of existing roof lights at roof level; (v) modifications to external services yard and parking areas to include new entrance to staff car park from the northeast, closure of vehicular linkage between the service yard and staff car park, reconfiguration of visitor car parking to northeast; (vi) removal of existing septic tank and installation of new sewage treatment system, and all associated ancillary development works, including landscaping at their light industrial facility
Lehenaghmore , Togher , Cork
Retention of first floor offices and permission for alterations to elevations to include first floor windows, fire escape stairs and doors at existing Industrial Unit/Warehouse.
Lehenaghmore , Togher , Co. Cork
Permission for Retention of conversion of existing attached garage to living space, Permission for Retention of detached domestic garage and permission for the conversion of the existing attic space to living space and associated site works
Tarkeer House , Lehenagh , Togher
Permission for the construction of 2 no. commercial warehouse units (measuring 1,663 sqm and 1,566 sqm) for distribution/storage purpose, together with all ancillary development including the provision of access roads, loading docks, underground storm water attenuation tanks and landscaping
Westgate Business Park , Lehenaghmore , Togher
Permission for the proposed change of use of Unit no. 6 from warehousing to light industry.
Unit 6 , Westgate Business Park , Lehenaghmore
For retention planning permission for the as constructed ground floor facilities layout and retention of the as constructed of a mezzanine floor over the ground floor staff facilities area. The mezzanine floor consists of 2 no. offices and associated office store at the north western corner of the existing Unit 6 Building, Westgate Business Park, Lehenaghmore, Togher, Cork. (Previusly granted permission Ref. No. 23/41843).
Unit 6 , Westgate Business Park , Lehenaghmore
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?