The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2342288

CONDITIONAL

Cork - Cork City Council

Proposed Development

Permission for the demolition of part of an existing warehousing building and the construction of a new extension to the warehousing building including a cantilever canopy, waste enclosure with a roof level generator within a plant enclosure and all associated site development works at the Hollymount Industrial Estate, Hollyhill, Cork. The proposed use of new extension includes warehouse space and a central food processing unit with staff facilities and office space at mezzanine level. The proposed site development works include the construction of a new substation building, new vehicular gate providing access to all both occupiers of the site and a new pedestrian access from Harbour View Road. The development comprises of an activity which requires a Waste Permit under the Waste Management Act 1996 (as amended).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Sept 2023

  2. Decision: CONDITIONAL

    10 Jan 2024

  3. Decision due

    12 Jan 2024

  4. Grant issued

    19 Feb 2024

Application Details

Location
Hollymount Industrial Estate , Hollyhill , Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
7 September 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 January 2024
Grant Date
19 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

102m
1737454CONDITIONAL2 Jun 2017

permission is sought by Eamon Long and Company T/A Earthmoving Wear Parts Ltd. for (a) subdivision of existing Industrial Unit into three smaller Industrial Units, (b) alterations to elevations associated with the above subdivision including removal of false front façade and recladding of original façade, (c) additional vehicular entrance to west boundary corner, (d) signage to front elevation, all to existing detached industrial unit

industrial Unit at Hollymount Industrial Estate , Hollyhill , Cork

106m
2140354CONDITIONAL14 Jul 2021

Permission for development to consist of 1010m2 (543 No) of roof mounted Solar PV panels and all associated works across 2 roofs

Hollymount Industrial Estate , Blarney Road , Cork

109m
2139877CONDITIONAL2 Feb 2021

Permission is sought for the erection of 1. Lean-to and Roof Mounted Solar Panels to the South East Elevation of Existing Unit and associated service gantry. 2. New deck with perimeter railing to accommodate Geodome satellite receivers to Existing Roof of Existing Unit and associated site works.

Unit 8 , Hollyhill Industrial Estate , Hollyhill

109m
2443320N/A15 Oct 2024

permission for 1) the erection of two roof mounted insulated chimneys 2)two diesel storage tanks each with a capacity of 10000 litres 3)two water storage tanks each with the capacity of 10000 litres 4) one bund area consisting of a total capacity of 11000 litres. additionally permission is sought for the retention of 1) external plant room 2) a low height wall with fencing a service footpath and electrical and data groundworks on the northwest elevation 3) roof mounted solar panels on the southeast elevation 4) four roof mounted air inlet vents and minor alterations to the fenestration on the northeast elevation

Unit 8 , Hollyhill Industrial Estate , Hollyhill

117m
2442615REFUSED22 Jan 2024

Permission is sought for: (1) An increase in the permitted tonnage of end-of-life tyres from 2500 tonnes per annum (permitted under planning reference 11/34954) to 7000 tonnes per annum; (2) Installation of a proposed Petrol Interceptor at Hollymount Industrial Estate, Hollyhill, Cork. Retention permission is also sought for an external three-sided storage bunker for the temporary storage of tyres prior to transporting off site at Hollymount Industrial Estate, Hollyhill, Cork, This application relates to an activity requiring a waste permit at Hollymount Industrial Estate, Hollyhill, Cork.

Hollymount Industrial Estate , Hollyhill , Cork City

217m
2139966CONDITIONAL2 Mar 2021

Permission for modifications to the existing warehouse building and all ancillary site development works at the Former Banta site, Hollymount Industrial Estate, Hollyhill, Cork. The proposed development consists of a change of use of part of the existing warehouse building to use as a testing and measurement facility with ancillary office use and modifications to the building consisting of: the construction of a new mezzanine floor; and modifications to the façade including (1) New windows at first floor level, relocation of doors and opening; and (2) The installation of extract fans and associated ducts. The proposed site development works include: (a) The removal of 1 no. existing shelter; (b) The relocation of an existing generator; (c) Installation of a bicycle rack; (d) The construction of an external plant enclosure comprising of a back up generator with associated diesel tank, air chiller with associated circulation pumps, 2 no. air handling units, 4 no. external condenser units and gas storage tanks; and (e) An external plant enclosure comprising of an air handling unit.

The Former Banta Site , Hollymount Industrial Estate , Hollyhill

218m
2139871CONDITIONAL1 Feb 2021

Permission for alterations within the existing lower service yard consisting of the construction of a 110.5m2 single storey extension with a rooftop plant enclosure to an existing production building and all ancillary site development works.

Hollyhill Industrial Estate , Tadgh Barry Road , Holyhill

225m
2341790CONDITIONAL17 Feb 2023

Permission for modifications to and the expansion of the existing plant compound permitted by Ref. No. 21/39966 and all associated site development works at Hollymount 2, Hollymount Industrial Estate, Hollyhill, Cork. The proposed works consist of: (1) The construction of an expanded plant compound and the installation of (A) Condenser units, (B) 1 no. air handling unit, (C) 3 no. dry air coolers, and (D) The construction of 2 no. pump enclosures. Permission is also sought for the retention of modifications to the existing plant compound permitted by Ref. No. 21/39966 comprising of an increase in the area of the plant compound and the provision of 2 no. pump enclosures within the compound.

Hollymount 2 , Hollymount Industrial Estate , Hollyhill

226m
2543984CONDITIONAL27 Jun 2025

Permission for the construction of an equipment storage building and all ancillary site development works.

Hollyhill Industrial Estate , Hollyhill , Cork

236m
1938283CONDITIONAL1 Mar 2019

Permission for the construction of 2 no. plant buildings, 2 no. oil tanks and all associated site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Hollyhill, Cork. The proposed plant buildings will be located within the existing service yard and will accommodate back-up generators, a medium voltage switchroom and a control room.

Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?