The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2343

CONDITIONAL

Leitrim - Leitrim County Council

Proposed Development

(a) the existing home office space and all ancillary works, and (b) upgrade the existing wastewater treatment system to a current EPA code of practice.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Apr 2023

  2. Further information requested

    22 May 2023

  3. Further information received

    13 Nov 2023

  4. Decision: CONDITIONAL

    13 Dec 2023

  5. Decision due

    21 Dec 2023

  6. Grant issued

    24 Jan 2024

Application Details

Location
Corderay , Drumshanbo , Co Leitrim
Applicant
N/A
Application Type
RETENTION
Planning Authority
Leitrim County Council

Timeline

Registration Date
5 April 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 December 2023
Grant Date
24 January 2024
Permission Expires
23 January 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

648m
2390CONDITIONAL28 Sept 2023

a rear single storey extension & 2 No. Domestic Storage Sheds

Ardcolum , Drumshanbo , Carrick on Shannon

968m
2095CONDITIONAL24 Jun 2020

change of site boundary from that granted Planning Permission under Planning Reference P.14338 with associated site works

Drumderg Td , Drumshanbo , Co. Leitrim

1.1km
2460142CONDITIONAL17 Jul 2024

(1). construct a two story type domestic dwelling. (2). To construct a domestic garage. (3). To construct a new site entrance. (4). To connect to construct a waste water treatment system to current EPA code of practice, and all ancillary works.

Drumderg , Drumshanbo , Co Leitrim

1.1km
2621N/A1 Jul 2026

erect a domestic garage, fuel and storage shed and all associated works

Cornaroy , Drumshanbo , Co Leitrim

1.1km
20160CONDITIONAL29 Sept 2020

to retain existing two-storey dwelling house including attached domestic garage

Drumduff North Td. , Drumshanbo , Co Leitrim

1.2km
1821CONDITIONAL7 Feb 2018

(a) retention of change of use from games room to restaurant seating area, (b) retention of free standing sign (c) alterations to existing restaurant building consisting of new entrance door with external access ramp, internal modifications to provide entrance lobby and accessible WC, provision of new windows to western gable, provision of new external signage to western gable, provision of new external seating area and bicycle racks with all associated site development works

Maguires Cottages , Drumduff North , Drumshanbo

1.3km
22203CONDITIONAL28 Sept 2022

(a) demolish existing dwelling house, (b) construct replacement dwelling house and domestic garage and (c) carry out upgrade works to the existing onsite wastewater treatment system with all associated site development works

Cornaroy Td , Drumshanbo , Co Leitrim

1.4km
1870CONDITIONAL24 Apr 2018

(a) demolition of existing dwelling house and (b) construction of replacement dwelling house, domestic garage, on site wastewater treatment system, revised access onto the public road and associated site development works

Cornaroy , Drumshanbo , Co. Leitrim

1.5km
2030CONDITIONAL28 Feb 2020

(a) the provision of a proposed car port with connecting canopy to the rear of the existing dwelling house complete with all ancillary works; (b) retention permission for 2 no. detached domestic sheds to the rear of the existing dwelling house as per documents lodged to Leitrim County Council

Aughriman , Drumshanbo , Co. Leitrim

1.5km
2046CONDITIONAL24 Mar 2020

retain amended site boundaries to house No. 2 which have been enlarged by the incorporation of part of the green space into the curtilage of the house in lieu of Permission to amend site boundaries to house No. 2 so as to enlarge the site by incorporating part of the green space into the curtilage of the house

No. 2 Glen Ailinne , Moneynure Td & Drumhalwy , Drumshanbo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?