23444

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

CONSTRUCT A NEW TWO STOREY DWELLING HOSUE, WITH CONNECTION TO WASTEWATER TREATMENT SYSTEM AND ALL ASSOICATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Apr 2023

  2. Decision: CONDITIONAL

    15 Jun 2023

  3. Decision due

    18 Jun 2023

  4. Grant issued

    19 Jul 2023

Application Details

Location
THE PARK , KILLARNEY , CO KERRY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.207 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
24 April 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 June 2023
Grant Date
19 July 2023
Permission Expires
18 July 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2460052CONDITIONAL30 Jan 2024

Full planning permission to construct a new two storey dwelling house, with connection to wastewater treatment system and all associated site development works.

The Park , Killarney , Co. Kerry

31m
20636CONDITIONAL16 Jul 2020

(A)COMPLETE AND RETAIN EXTENTION TO DWELLING HOUSE CONTAINING NEW ENLARGED LIVING ROOM AREA. (B) TO COMPLETE AND RETAIN DETACHED ACTIVITY AND GYMNASIUM ROOMS FOR PRIVATE USE OVER EXISTING DETACHED FLAT ROOFED STORES ALL TO OUR PROPERTY

PARK , TOWNLAND , KILLARNEY

248m
21397CONDITIONAL15 Apr 2021

ERECT 3,791.00 M2 OF PHOTOVOLTAIC PANELS ON THE ROOF OF TWO BUILDINGS OF OUR FACTORY, WITH ALL ASSOCIATED SITE WORKS

TRICEL (KILLARNEY) UNILIMITED COMPANY , BALLYSPILANE INDUSTRIAL ESTATE , KILLARNEY

275m
18896CONDITIONAL14 Sept 2018

CONSTRUCT A SINGLE STOREY, ESB MV SUBSTATION AND CUSTOMER SWITCH ROOM, PER ESB SPECIFICATIONS, WITHIN ITS EXISTING SITE COMPLEX

BALLYSPILLANE INDUSTRIAL ESTATE , KILLARNEY , CO. KERRY

275m
23163CONDITIONAL17 Feb 2023

(A) CONSTRUCT A NEW PORTAL FRAME SHED FOR THE STORAGE AND CHARGING OF FORKLIFTS, (B) EXTEND AN EXISTING CONCRETE YARD, (C) ERECT A NEW BOUNDARY FENCE AND ALL ANCILLARY SITE WORKS

BALLYSPILLANE INDUSTRIAL ESTATE , BALLYSPILLANE , KILLARNEY

277m
22504CONDITIONAL13 May 2022

TO RETAIN AN EXISTING PORTAL FRAME STORAGE SHED AND PLANNING PERMISSION TO; (A) CONSTRUCT AN EXTENSION TO THE ABOVE EXISTING STORAGE SHED, (B) CONSTRUCT A NEW PORTAL FRAME MEATERIALS STORAGE SHED, (C) CONSTRUCT A NEW PORTAL FRAME SHED FOR THE STORAGE AND CHARGING OF FORKLIFTS, (D) ERECT A NEW BOUNDARY FENCE, (E) EXTEND AN EXISTING CONCRETE YARD AND ALL ANCILLARY SITE WORKS

BALLYSPILLANE INDUSTRIAL ESTATE , BALLYSPILLANE , KILLARNEY

279m
211426CONDITIONAL10 Dec 2021

CONSTRUCT A 3 STORY OFFICE BUILDING, ALTER THE ROAD LAYOUT AND INCORPORATE ADDITIONAL CAR PARK WITH ALL ASSOCIATED SITE WORKS

BALLYSPILLANE INDUSTRIAL ESTATE , BALLYSPILLANE , KILLARNEY

282m
18782N/A9 Aug 2018

CONSTRUCT A SINGLE STOREY ESB MV SUBSTATION AND CUSTOMER SWITCHROOM, PER ESB SPECIFICATIONS, WITHIN ITS EXISTING SITE COMPLEX

BALLYSPILLANE INDUSTRIAL ESTATE , KILLARNEY , CO KERRY

332m
2460275CONDITIONAL3 May 2024

Planning permission to construct a new employee car park with combined vehicular and pedestrian entrance, inclusive of all associated drainage, ancillary site works and landscaping all at the Ballyspillane Industrial Estate, Ballyspillane, Killarney, County Kerry.

Ballyspillane Industrial Estate , Ballyspillane Killarney , County Kerry

335m
23967CONDITIONAL5 Sept 2023

CONSTRUCT 249 NO. DWELLINGS COMPRISING OF 2 NO 5-BED HOUSES, 6 NO. 4-BED HOUSES, 117 NO. 3 BED HOUSES, 18 NO. 2-BED HOUSES, 68 NO. 2-BED APARTMENTS AND 38 NO. 1-BED APARTMENTS. ALL HOUSES AND APARTMENTS ARE CONTAINED IN TWO STOREY BUILDINGS IN HEIGHT AND COMPRISE A MIX OF TERRACE AND SEMI-DETACHED TYPOLOGIES.HOUSE TYPE F (4-BED SEMI-DETACHED) AND HOUSE TYPE G ( 5 BED- SEMI-DETACHED) INCLUDE RESIDENTIAL ACCOMMODATION AT ATTIC/SECOND LEVEL WITH ASSOCIATED ROOFLIGHTS. THE APARTMENTS INCLUDE BALCONIES/GROUND FLOOR TERRACES AS PRIVATE OPEN SPACE PROVISION. THE DEVELOPMENT INCLUDES PUBLIC OPEN SPACE INCLUDING PLAY FACILITES, A NEW VEHICULAR ACCESS FROM UPPER PARK ROAD, ALL INTERNAL ROADSAND FOOTPATHS INCLUDING A NUMBER OF HOMEZONES/SHARED SURFACES, BOUNDARY TREATMENT AND HARD AND SOFT LANSSCAPING, DRAINGAE WORKS FOR THE NEW DEVELOPMENT AND ALL ASSOCIATED AND ANCILLARY WORKS. THE PROPOSED DEVELOPMENT ALSO INCLUDES A NEW TWO-WAY CYCLEPATH AND A FOOTPATH ALONG UPPER PARK ROAD, WITH PEDESTRIAN CROSSINGS ON UPPER PARK ROAD, A TWO STOREY CRECHE OF C.417 SQ.M GROSS FLOOR SPACE WITH ASSOCIATED OPEN SPACE AND PV PANELS AT ROOF LEVEL: 510 NO. SURFACE CAR PARKING SPACES (INCLUDING ACESSIBLE SPACES) FOR THE RESIDENTIAL DEVELOPMENT AND 19 NO. SURFACE CAR PARKING SPACES FOR THE CRECHE, 352 NO. BICYCLE PARKING SPACES ARE PROVIDED IN SECURE FACILITIES FOR THE MAISONETTE UNITS TO THE REAR OF EACH UNIT. A NATURA IMPACT STATE HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT.

UPPER PARK ROAD , KILLARNEY , CO KERRY