2350

N/A

Clare - Clare County Council

Proposed Development

to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Feb 2023

  2. Further information requested

    27 Mar 2023

  3. Application withdrawn

    6 Mar 2024

Application Details

Location
Furroor , Lissycasey , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
406.1 sq m
Residential Units
1

Timeline

Registration Date
1 February 2023
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
6 March 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24217CONDITIONAL3 Jul 2024

to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works

Furroor , Lissycasey , Ennis Co Clare

222m
2560655N/A24 Oct 2025

to retain the renovations to an existing single storey dwellinghouse. The renovations include raising the height of the ridge by 500mm, re-roofing the dwelling house, creating accommodation at first floor level, all internal renovations and connecting to existing services. Permission is sought to retain the mobile home on the site for the duration of the remedial works to the dwelling house and the removal of same on completion of the works

Cherryblossom Cottage , Furroor East , Lissycasey Co Clare V95N2Y2

222m
2560792CONDITIONAL12 Dec 2025

to RETAIN the remedial works to the existing dwelling house. The renovations include raising the height of the ridge by 500mm, re-roofing the dwelling house, creating accommodation at first floor level, and PERMISSION is sought to complete all the internal renovations and connecting to existing services. PERMISSION is sought to upgrade the existing sewage treatment system. Permission is sought to RETAIN the mobile home on the site for the duration of the remedial works to the dwelling house and the removal of same on completion of the works

Cherryblossom Cottage , Furroor Lissycasey , Ennis

373m
2560326CONDITIONAL4 Jun 2025

to erect dwelling house, waste water treatment system, percolation area, new site entrance and all associated works

Furroor , Lissycasey , Co. Clare

757m
21583CONDITIONAL4 Jun 2021

to alter and extend their existing dwelling house, construct a new shed and install a new proprietary treatment system along with associated site works

Furroor , Lissycasey , Co. Clare

948m
21136CONDITIONAL18 Feb 2021

to RETAIN the following alterations to dwelling house (a) Sunroom as constructed to west of dwelling (b) Oversize half dormer windows to front elevation as constructed. (c) Roof over front porch as constructed. (d) Domestic garage as constructed. (e) Existing entrance onto public road and all associated site works

Furroor , Lissycasey , Ennis Co Clare

1.3km
2279CONDITIONAL2 Feb 2022

to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works

Furroor , Lissycasey , Ennis Co Clare

1.3km
2660521N/A13 Aug 2026

to construct a new dwelling, garage, site entrance and wastewater treatment system along with all ancillary works on the site

Frure North , Lissycasey , Co. Clare

1.5km
20442CONDITIONAL2 Jul 2020

to RETAIN revised site boundaries, additional velux roof lights to front and rear elevations of dwelling, plastered block wall to front boundary of site, garage as positioned on site with additional window and door to western elevation and all associated site works

Frure , Lissycasey , Co Clare

1.5km
221167CONDITIONAL22 Dec 2022

to construct a new dwelling and garage with a new entrance, sewage treatment system and ancillary works

Furroor , Lissycasey , Ennis Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?