2351509
N/ADonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A SINGLE STOREY ONE BEDROOM APARTMENT WITHIN THE CONFINES OF THE PROPERTY INCLUDING CONNECTION TO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT
View the full application file on the council's planning portal →Application Timeline
Application received
9 Oct 2023
Application withdrawn
23 Jan 2024
Decision due
24 Nov 2024
Application Details
- Location
- NO. 64 BALLYRAINE PARK , LETTERKENNY , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.046 ha
Timeline
- Registration Date
- 9 October 2023
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 24 November 2024
- Withdrawn
- 23 January 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A SINGLE STOREY APARTMENT WITHIN THE CONFINES OF THE PROPERTY INCLUDING CONNECTION TO MAINS SERVICES AND ASSOCIATED SITE DEVELOPMENT WORKS
64 BALLYRAINE PARK , BALLYRAINE , LETTERKENNY PO
APARTMENT TO THE SIDE OF EXISTING DWELLING
63 BALLYRAINE PARK , LETTERKENNY , LETTERKENNY PO
REFURBISHMENT, EXTENSION AND ALTERATIONS INCLUDING ASSOCIATED SITE WORKS
NO. 46 BALLYRAINE PARK , BALLYRAINE , LETTERKENNY
(1) ERECTION OF A DRIVE THROUGH CAFÉ (2) ALTERATIONS TO THE EXISTING ROAD LAYOUT, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
BALLYRAINE , LETTERKENNY , LETTERKENNY PO
ERECTION OF A DRIVE THROUGH CAFÉ, ALTERATIONS TO THE EXISTING ROAD LAYOUT, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
BALLYRAINE , LETTERKENNY , CO. DONEGAL
CONSTRUCTION OF A CARPORT AND A COVERED DECK EXTENSION TO THE REAR OF EXISTING DWELLING WITH ALL ASSOCIATED SITE WORKS
17 ORCHARD GROVE , BALLYRAINE , LETTERKENNY
REPLACEMENT OF 2 NO. OBSOLETE UNDERGROUND TANKS WITH 2 NO. 2000 LITRE OVERGROUND BUNDED STORAGE TANKS, USED TO STORE KEROSENE AND MARKED GAS OIL
SWEENEY'S SPAR EXPRESS , BALLYRAINE , LETTERKENNY
CHANGE OF USE FROM OFFICE SPACE TO STUDENT ACCOMMODATION ON FIRST AND SECOND FLOOR AND CONSTRUCTION OF 2 STOREY EXTENSION TO REAR OF BUILDING TO PROVIDE THE FOLLOWING ACCOMMODATION: (1) ADDITIONAL STORAGE AND STAFF ACCOMMODATION ASSOCIATED WITH EXISTING SHOP ON GROUND FLOOR, (2) 20 NO. SINGLE BEDROOMS, 8 NO. TWIN BEDROOMS, SHARED LIVING AND ANCILLARY ACCOMMODATION INCLUDING SHARED AMENITY ROOF GARDEN SPACES TO FIRST AND SECOND FLOOR INCLUDING REVISIONS TO EXISTING ELEVATIONS. ALSO ALL ASSOCIATED SITE WORKS TO INCLUDE EXTERNAL LAUNDERETTE, ADDITIONAL PARKING, LANDSCAPED AMENITY AREA, PEDESTRIAN LINK FROM CARPARK TO PROPOSED ACCOMMODATION AND CONNECTION TO FOUL AND STORM SEWERS ON SITE
SWEENEY'S SPAR EXPRESS , BALLYRAINE , LETTERKENNY PO
ERECTION OF A TEMPORARY NEW PREFABRICATED CLASSROOM BLOCK TO CONSIST OF 2 NO. 80 M2 CLASSROOMS AND 2 NO. SET ROOMS WITH CONNECTION TO ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYRAINE , LETTERKENNY , LETTERKENNY PO
(1) RENOVATION WORKS TO EXISTING HOUSE INTERNALLY, INCLUDING MINOR WORKS TO GROUND FLOOR AND WORKS TO FIRST FLOOR TO INCREASE THE USEABLE FLOOR AREA (2) EXTERNAL WORKS TO THE EXISTING ROOF TO THE SIDE OF THE HOUSE INVOLVING RAISING THE ROOF PITCH AT THE FRONT TO INCREASE INTERNAL USEABLE FLOOR AREA (3) INSTALLATION OF NEW WINDOW AT FIRST FLOOR LEVEL TO FRONT OF HOUSE
30 BALLYRAINE PARK , BALLYRAINE , LETTERKENNY PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?