2351938
CONDITIONALDonegal - Donegal County Council
Proposed Development
EXTENSION AND RENOVATION TO DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
18 Dec 2023
Decision: CONDITIONAL
15 Feb 2024
Decision due
20 Feb 2024
Grant issued
20 Mar 2024
Application Details
- Location
- MEENABOLLAGAN , DUNGLOE , LETTERKENNY
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 0.16 ha
Timeline
- Registration Date
- 18 December 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 February 2024
- Grant Date
- 20 March 2024
- Permission Expires
- 19 March 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
EXTENSION AND RENOVATION TO EXISTING DWELLING HOUSE TO PROVIDE FOR ADDITIONAL LIVING ACCOMMODATION AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MEENABOLLAGAN , DUNGLOE , LETTERKENNY PO
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE WITH TREATMENT PLANT AND POLISHING UNIT AND ALL ASSOCIATED SITE WORKS
MEENABOLLAGAN , DUNGLOE , LETTERKENNY PO
CONSERVATORY BUILT TO THE FRONT ELEVATION OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
MEENABOLLAGAN , DUNGLOE , LETTERKENNY PO
ERECTION OF A METEOROLOGICAL MAST, WITH A MAXIMUM HEIGHT OF 100 METERS, FOR THE PURPOSE OF MEASURING AND RECORDING METEOROLOGICAL DATA; AND ALL ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT WILL BE UP TO FIVE YEARS
MEENLECKNALORE , CO. DONEGAL
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CROAGHNASHALLOG , DUNGLE , LETTERKENNY PO
10 YEAR PLANNING PERMISSION AND A 35 YEAR OPERATIONAL LIFE FOR THE INSTALLATION AND OPERATION OF FIVE (5) WIND TURBINES, EACH WITH A MAXIMUM TIP HEIGHT OF 86M AND A TOTAL CAPACITY OF 4.9 MW, CONSTRUCTION OF ASSOCIATED FOUNDATIONS, CRANE BASES, AND HARDSTANDING AREAS (TOTAL AREA APPROXIMATELY 2,625 M²), ON-SITE MEDIUM VOLTAGE (MV) SUBSTATION TO ESB NETWORKS SPECIFICATIONS, WITH APPROXIMATELY 2.5KM OF UNDERGROUND 20KV CABLE CONNECTING TO THE EXISTING ESB DUNGLOE 38KV SUBSTATION, CONSTRUCTION OF APPROXIMATELY 2KM OF INTERNAL ACCESS TRACKS, INSTALLATION OF ON-SITE SPOIL DEPOSITION AREAS, LAYDOWN AREAS, AND TEMPORARY CONSTRUCTION COMPOUND, INCLUDING WELFARE FACILITIES AND MATERIALS STORAGE, PROVISION OF SERVICE ACCESS FOR LIGHT VEHICLES VIA THE EXISTING DIAMOND ROAD, PROVISION OF TEMPORARY DELIVERY ACCESS VIA THE EXISTING N56, INSTALLATION OF APPROXIMATELY 1.2KM OF UNDERGROUND CABLING CONNECTING THE TURBINES AND ERECTION OF SITE SIGNAGE AND ALL ANCILLARY SITE DEVELOPMENT WORKS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C.25.24 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CROAGHNASHALLOG , DUNGLOE , LETTERKENNY PO
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)
CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL
CHANGE OF HOUSE DESIGN & REPOSITIONING OF HOUSE FROM THAT PREVIOUSLY GRANTED UNDER PLANNING PERMISSION REF NO. 18/50438 & CONSTRUCTION OF A NEW DOMESTIC GARAGE
DERRYDRUEL , MAGHERY , CO. DONEGAL
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
DERRYDRUEL UPPER , MAGHERY , LETTERKENNY PO
CHANGE OF HOUSE DESIGN FROM THAT PREVIOUSLY GRANTED UNDER PLANNING PERMISSION REF. NO. 21/51481
DERRYDRUEL UPPER , MAGHERY , CO. DONEGAL
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?