23577

N/A

Clare - Clare County Council

Proposed Development

to construct 2 No semi-detached dwelling houses, connection to existing public service infrastructure, access entrances to the road network permitted development Ref No: P20/740 and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Nov 2023

  2. Application withdrawn

    15 Jan 2024

  3. Decision due

    19 Jan 2024

Application Details

Location
Church Road , Clonlara , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
584 sq m
Residential Units
2

Timeline

Registration Date
16 November 2023
Status
WITHDRAWN
Decision
N/A
Decision Due
19 January 2024
Withdrawn
15 January 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2567CONDITIONAL7 Mar 2025

to construct one detached dwelling house, connection to existing public service infrastructure, access entrance to the road network of permitted development, Ref Nos: P20/740 and P24/60432 and all associated site works

Church Road , Clonlara , Co Clare

0m
24265N/A21 Aug 2024

to construct 2 No. semi-detatched dwelling houses, connection to existing public service infrastructure, access entrances to the road network of permitted development, Ref. No. P20-740 and all associated site works

Church Road , Clonlara , Co. Clare

0m
23513N/A3 Oct 2023

to construct 2 No semi-detached dwelling houses, connection to existing public service infrastructure, access entrances to the road network of permitted development, Ref No: P20/740 and all associated site works

Church Road , Clonlara , Co Clare

103m
18722CONDITIONAL11 Sept 2018

to construct an extension to dwelling house, decommission existing septic tank and percolation area and connect to public sewer, construct a domestic garage and all associated site works

Clonlara , Co. Clare

119m
21679N/A29 Jun 2021

to construct a dwelling house, garage, entrance and all associated works

Church Road , Clonlara , Co. Clare

119m
211082N/A13 Oct 2021

to construct dwelling house, garage and connection to public services and RETENTION Permission for new as constructed entrance and all associated site works

Church Road , Clonlara , Co. Clare

136m
19688REFUSED2 Sept 2019

to construct dwelling house, garage, entrance and all associated site works

Church Road , Clonlara , Co. Clare

164m
2460250CONDITIONAL29 May 2024

for alterations to the existing ground and first floor layouts to incorporate a café on the ground floor, gym and cardio studio on the ground and first floors, new meeting room on the first floor, minor internal alterations, modifications to the existing elevations to incorporate new windows, together with all associated ancillary and incidental works.

Clonlara Community Sports & Leisure Centre , Clonlara , Co Clare V94VXD4

170m
2460384N/A16 Aug 2024

for change of House Design from that previously approved under P20/740 for specified houses. Houses 4 & 6 Errina Locke and Houses 5 & 7 Errina Close proposed to be replaced with New House Type 5D. Additionally Houses 6 & 8 Errina Close and Houses 5 & 7 Errina Locke to be replaced with new House Type 5E, including all ancillary site works

Errina , Clonlara , Co. Clare

172m
2460432CONDITIONAL6 Sept 2024

for construction of amendments to Housing layout approved under P20/740 to include (a): Replacement of 4 No. Detached, Type 5 Houses at Errina Locke with 6 No. Detached, Type 4 houses. (b) Minor revision to road layout to include visitor parking and revised turning hammerhead at Errina Locke. (c) Change of House Design to Type 5D for No. 5 & 7 Errina Close. (d) Change of House Design to Type 5E for No. 6 & 8 Errina Close, (e) including revised house boundaries & all ancillary site works

Errina , Clonlara , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.