The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360103

N/A

Kildare - Kildare County Council

Proposed Development

This Development Will Consist of Planning Permission sought for Domestic Shed and all associated site works.

View the full application file on the council's planning portal →

Application Details

Location
Newtoenpilsworth , Maganey , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.303 ha

Timeline

Registration Date
9 August 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

21m
2360115CONDITIONAL15 Aug 2023

for Domestic Shed and all associated site works.

Newtownpilsworth , Maganey , Co. Kildare

439m
23472CONDITIONAL4 May 2023

to construct a dwelling house, domestic garage, waste water treatment system, percolation area, new splayed entrance and associated site work

Bo Choill Road , Maganey , Athy

466m
21163REFUSED12 Feb 2021

to construct a dwelling house, domestic garage, waste water treatment system, percolation area, new splayed entrance and associated site works

Bo Choill Road , Maganey , Athy

482m
211005REFUSED9 Jul 2021

to construct a dwelling house, domestic garage, waste water treatment system, percolation area, new splayed entrance and associated site work

Bo Choill Road , Maganey , Athy

583m
19822CONDITIONAL22 Jul 2019

the closure of two existing agricultural entrances and the provision of one new vehicular entrance and access road; the construction of two detached part single-storey part two-storey three/four-bedroom houses with detached garages and two detached part single-storey part two-storey four/five-bedroom houses with integrated garages; the provision of four Aswaflow SBR wastewater treatments systems and polishing filters, landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground

Maganey Lower , Co. Kildare

638m
201615REFUSED23 Dec 2020

to construct a two storey dwelling, garage, new splayed entrance, install a waste water treatment unit and percolation area and all other ancillary site works

Maganey Upper , Athy , Co. Kildare.

708m
20504N/A1 Oct 2020

the demolition of the existing shed and the construction of a new part two storey, part single storey extension to the side and rear of the existing single storey house with internal and external alterations, the construction of a single storey garage, new entrance gates to the both existing site access locations and associated hard and soft landscaping

Grange , maganey Carlow , Co. Laois R93H9C6

708m
20515CONDITIONAL7 Oct 2020

the demolition of the existing shed and the construction of a new part two storey, part single storey extension to the side and rear of the existing single storey house with internal and external alterations, the construction of a single storey garage, new entrance gates to the both existing site access locations, new effluent treatment plant and percolation area and associated hard and soft landscaping

Grange , Maganey Carlow , Co. Laois R93H9C6

708m
2660267N/A12 May 2026

construct a single storey dwelling house, domestic garage and new splayed entrance. The proposed development will include connection to the existing wastewater treatment system installed under Planning Reference No. 20/515, together with water supply from the existing bored well approved under the same planning reference, and all associated site development works. An Natura Impact Statement (NIS) has been submitted on request of S177T(5)

Grange , Maganey , Co Laois

715m
17273CONDITIONAL14 Mar 2017

the construction of a dormer style dwelling, secondary treatment system with sand polishing filter, domestic entrance, bored well and all ancillary site works

Bo Choill Road , Maganey , Athy

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?