The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2360115

N/A

Cavan - Cavan County Council

Proposed Development

for proposed extension to existing dwelling house, to include: (i) At ground floor: entrance hall, kitchen-dining-living area, sitting room, utility, pantry, and plant room (ii) At first floor: 2 no. ensuite bedrooms with walk-in wardrobes, landing, and office. (iii) With new entrance from existing private avenue (iv) With permission to upgrade the existing sewerage system to a new treatment system and percolation area. (v) With connection to existing services and all associated site works.

View the full application file on the council's planning portal →

Application Details

Location
Corr , Loughduff , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.637 ha

Timeline

Registration Date
26 July 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360151CONDITIONAL23 Aug 2023

for proposed extension to existing dwelling house, to include: (i) At ground floor: entrance hall, kitchen-dining-living area, sitting room, utility, pantry, and plant room (ii) At first floor: 2 no. ensuite bedrooms with walk-in wardrobes, landing, and office. (iii) With new entrance from existing private avenue (iv) With permission to upgrade the existing sewerage system to a new treatment system and percolation area. (v) With connection to existing services and all associated site works

Corr , Loughduff , Co. Cavan

172m
1917REFUSED23 Jan 2019

to erect new dwelling house, garage, entrance, boundary walls, piers with sewerage treatment system and percolation area

Corr , Clanmahon By , Loughduff

488m
20238CONDITIONAL24 Jun 2020

for alterations & extension to existing dwelling house to include ground floor kitchen, utility room, shower room & bedroom, first floor bathroom & 3 no bedrooms, erect domestic garage, upgrade entrance with new sewerage treatment system & percolation area. Significant further information and revised plans have been received.

Corduff , Ballinagh , Co Cavan

524m
21551CONDITIONAL6 Sept 2021

to construct cubicle shed incorporating underground effluent tank and all associated site works

Corr , Loughduff , Co Cavan

534m
22466CONDITIONAL21 Nov 2022

to construct cubicle shed incorporating underground effluent tank and all associated site works

Corr , Loughduff , Co. Cavan

569m
20375CONDITIONAL28 Aug 2020

to retain revised dwelling position, alterations & extension to living room, changes to windows, door openings, additional roof lights and PERMISSION to complete construction and install a treatment system & percolation area (Previous planning ref. no. 05/771). Retain 2 no. existing machinery store and concrete slabs. Retain concrete base for domestic machinery store with PERMISSION to erect same. Retain domestic store/wendy house ref planning ref. no. 05/1455

Corduff , Ballinagh , Co. Cavan

696m
2660010CONDITIONAL16 Jan 2026

for the installation of a new wastewater treatment system and sand polishing filter and all site works associated with the development

Loch Lee , Corduff House , Ballinagh Co Cavan.

811m
21164REFUSED22 Mar 2021

construct two storey type dwelling house with detached garage, entrance, boundary wall / fence, wastewater treatment system with percolation area and all ancillary site works

Corduff , Ballinagh , Co Cavan

1.0km
18460CONDITIONAL31 Oct 2018

to erect fully serviced dormer/storey and a half type dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works

Corr , Loughduff , Co. Cavan

1.2km
1770CONDITIONAL1 Mar 2017

to erect fully serviced community centre, entrance, associated carparking, sewerage treatment facilities and all ancillary works. Significant further information and revised plans have been submitted

Carrigan , Ballinagh , Co Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?