a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development will also be lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application
View the full application file on the council's planning portal →Application Details
- Location
- in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 3.84 ha
Timeline
- Registration Date
- 22 September 2023
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development has been lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application
In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS
WOODFIELD OR TULLYNISK , BIRR , CO OFFALY
INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY
The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building. Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the existing school building. Replacement of selected existing steel framed windows with new thermally broken powder-coated steel windows. Construction of a new Boiler House and Storage Shed on the South side of the existing school building. Associated site development works, including staff carpark realignment with new fencing with gates and a new replacement Ball Court to the east of the school buildings with all associated site development works.
St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly
The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building. Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the existing school building. Replacement of selected existing steel framed windows with new thermally broken powder-coated steel windows. Construction of a new Boiler House and Storage Shed on the South side of the existing school building. Associated site development works, including staff carpark realignment with new fencing with gates and a new replacement Ball Court to the east of the school buildings with all associated site development works.
St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly
CONSTRUCTION OF A THREE CLASSROOM, SINGLE STOREY EXTENSION TO ST. BRENDAN'S COMMUNITY SCHOOL WITH ASSOCIATED SITE DEVELOPMENT WORKS
ST. BRENDAN'S COMMUNITY SCHOOL , CAPPANEALE , BIRR CO. OFFALY
THE FOLLOWING: ERECTION OF A FULLY SERVICED RESIDENTIAL HOUSING DEVELOPMENT OF 40 UNITS, CONSISTING OF 4.NO SINGLE STOREY SEMI-DETACHED 2 BEDROOM BUNGALOWS, 2 NO. SINGLE STOREY MID-TERRACE 1 BEDROOM BUNGALOWS, 20.NO. 3 BEDROOM 2 STOREY SEMI-DETACHED HOUSES, 6.NO. 3 BEDROOM 2 STOREY MID-TERRACE HOUSES AND 8. NO. 1 BEDROOM APARTMENTS IN 4 NO. 2 STOREY SEMI-DETACHED BLOCKS, WITH ALL ASSOCIATED SITE SERVICES, LANDSCAPING, SITE WORKS, BOUNDARY TREATMENTS, AND NEW ACCESS
LANDS TO THE EAST OF AND ACCESSED VIA THE EXISTING DEVELOPMENT AT FOREST VIEW , BANAGHER ROAD R439 TOWNPARKS BIRR , CO. OFFALY
A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES AND SERVICES, SITE WORKS AND LANDSCAPING TO INCLUDE NEW ACCESS ROAD AND ENTRANCE OFF NEW DISTRIBUTOR ROAD, ATTENUATION TANKS, CAR PARKING AND SET DOWN, AND ALL ASSOCIATED SITE WORKS AND SERVICES
TOWNPARKS , BIRR , CO. OFFALY
REPLACEMENT OF 2.NO 3 BEDROOM SEMI-DETACHED 2 STOREY HOUSES (NUMBERS 23 AND 24) WITH A TERRACE OF 3 HOUSES NUMBERED 23, 23A AND 24 CONSISTING OF (2 NO. 3 BEDROOM 2 STOREY END OF TERRACE HOUSES AND 1 NO. 2 BEDROOM 2 STOREY MID TERRACE HOUSE) AND CONSEQUENTIAL MINOR RELOCATION OF HOUSES NUMBERED 25-30 AND ALL ASSOCIATED SITE WORKS AT THE DEVELOPMENT CURRENTLY PERMITTED UNDER REF NO. 19282
WOODFIELD ON LANDS TO WEST OF MCAULEY DRIVE , TULLAMORE ROAD TOWNPARKS , BIRR CO. OFFALY
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?