2360134

N/A

Clare - Clare County Council

Proposed Development

the demolition of an existing dwelling house (Eircode V95 PK12) and for the development of 23 no. dwelling houses comprising a mix of single storey, dormer storey and two storey houses, a wastewater pump station, associated ancillary site works and site services and connections to public services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Apr 2023

  2. Application withdrawn

    14 Sept 2023

  3. Decision due

    15 Sept 2023

Application Details

Location
Holland Street , Liscannor tld. , Liscannor
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
1.673 ha

Timeline

Registration Date
28 April 2023
Status
WITHDRAWN
Decision
N/A
Decision Due
15 September 2023
Withdrawn
14 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
211360N/A21 Dec 2021

for the demolition of an existing dwelling house (Eircode V95 PK12 and for the development of 23 no. dwelling houses comprising a mix of single storey, dormer storey and two storey houses, a wastewater pump station, associated ancillary site works and services and connections to public services

Holland Street , Liscannor Liscannor Tld , Co Clare

7m
2360114N/A14 Apr 2023

the demolition of an existing dwelling house (Eircode V95 PK12) and for the development of 23 no. dwelling houses comprising a mix of single storey, dormer storey and two storey houses, a wastewater pump station, associated ancillary site works and site services and connections to public services

Holland Street , Liscannor tld. , Liscannor

161m
2560042REFUSED31 Jan 2025

to construct 5 no. houses, on site wastewater pre treatment, connections to public services, access road & green space, entrances and all associated site development works

Holland Street , Liscannor , Co. Clare

162m
2460113REFUSED15 Mar 2024

to construct 6 no. houses, on site wastewater pre treatment, connections to public services, public road & green space, entrances and all associated site development works

Holland Street , Liscannor , Clare

173m
221140CONDITIONAL16 Dec 2022

Ref. No. P21/846 to construct a dwelling house, site entrance, connect to public services and carry out all ancillary site works

Site No. 9 Holland Street , Liscannor , Co Clare

178m
2560REFUSED4 Mar 2025

to build a new dwelling, install a pre treatment waste water treatment system connect to public services & all other associated site and ancillary works

Site No 8 Holland St , Liscannor , Co Clare

180m
21846CONDITIONAL11 Aug 2021

to construct 4 no. houses, on site wastewater pre treatment, connections to public services, public road, entrances and associated site development works on two adjacent sites of 0.1078 and 0.2036 ha

Holland Street , Liscannor , Co Clare

182m
25256N/A6 Aug 2025

to alter and extend the existing house, for use as a permanent residence and all associated and ancillary site works

22 Clochan Na Mara , Liscannor , Co Clare

184m
2360357CONDITIONAL5 Sept 2023

Ref. No. P22/209 to construct a house, connections to public services, a public road entrance and associated site development works

Plot No. 10 Holland Street , Liscannor , Co.Clare

189m
22209CONDITIONAL9 Mar 2022

to construct 2 no houses, connections to public services, public road entrances and associated site development works on plots no. 7 (0.0645 Ha) and 10. (0.0.645 Ha)

Holland Street , Liscannor Tld , Liscannor Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.