2360169

N/A

Louth - Louth County Council

Proposed Development

Permission for the construction of a road underpass on the public road for the movement of dairy cattle, approach roads on each side of same, for an underground drainage tank and for associated siteworks

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jun 2023

  2. Further information requested

    4 Aug 2023

  3. Application withdrawn

    14 Feb 2024

Application Details

Location
Mullincross , Dunleer , County Louth
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Louth County Council
Site Area
0.254 ha
Floor Area
1.1 sq m
Residential Units
1

Timeline

Registration Date
19 June 2023
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
14 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360100N/A11 May 2023

Permission for the construction of a road underpass on the public road for the movement of dairy cattle, approach roads on each side of same, for an underground drainage tank and for associated siteworks

Mullincross , Dunleer , County Louth

147m
18785CONDITIONAL28 Sept 2018

Permission for a new dellinghouse, septic tank and percolation area and all associated siteworks.*Significant Further Information submitted 04/12/2018*

Mullinscross , Dunleer , Co Louth

437m
18923CONDITIONAL14 Nov 2018

Permission for development to consist of permission to demolish an existing uninhabitable derelict out-building, erect a single storey and two storey extension to existing single storey dwelling. Modifications to existing dwelling, upgrade existing septic tank to that of a waste water treatment system and percolation area. Construct a new vehicular entrance to site, new boundary treatments and all associated site development works and services.

Mullins Cross , Dunleer , Co Louth

477m
2460559REFUSED19 Sept 2024

Retention permission for the change of use of an existing agricultural garage/workshop to commercial use (currently being used as an exercise and recreational facility, since the year 2018) and all associated works

Mullinscross , Dunleer , County Louth

478m
2660203N/A15 Apr 2026

Permission to construct a dry bedded shed for the housing of livestock, incorporating a cattle handling facility & slatted tank along with roofed silage base, grain store, machinery store & manure pit, together with new site entrance & other associated ancillary site works

Mullincross , Dunleer , Co. Louth

478m
2660268REFUSED7 May 2026

Permission to construct a dry bedded shed for the housing of livestock, incorporating a cattle handling facility & slatted tank along with roofed silage base, grain store, machinery store & manure pit, together with new site entrance & other associated ancillary site works

Mullincross , Dunleer , Co. Louth

499m
2660183N/A10 Apr 2026

Permission for a new agricultural shed to rear of dwelling house and all associated site works

Mullinscross , Dunleer , Co. Louth.

499m
2660230N/A23 Apr 2026

Permission for a new agricultural shed to rear of dwelling house and all associated site works

Mullinscross , Dunleer , Co. Louth.

556m
17942CONDITIONAL19 Dec 2017

Permission for development will consist of permission for a dwelling house, waste water treatment system and associated site development works. **SIGNIFICANT FURTHER INFORMATION RECEIVED 30/05/2018**

Mullins Cross , Dunleer , Co. Louth

822m
21588CONDITIONAL14 May 2021

Permission sought for side extension to existing dwelling house, refurbishment and alterations to existing dwelling house, revised site boundaries, waste water treatment system and percolation area and all associated site works

Cappoge , Dunleer , Co Louth

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?