The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360194

N/A

Kilkenny - Kilkenny County Council

Proposed Development

to construct a dwelling house and to convert existing sheds to a garage, with connections to the existing mains sewerage and mains water, including all necessary site works

View the full application file on the council's planning portal →

Application Details

Location
Mullinavat , Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.278 ha

Timeline

Registration Date
16 May 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360215CONDITIONAL26 May 2023

to construct a dwelling house and to convert existing sheds to a garage, to demolish two existing buildings on site, with connections to the existing mains sewerage and mains water, including all necessary site works

Mullinavat , Co. Kilkenny

0m
2560382CONDITIONAL25 Jun 2025

of works carried out to date on planning permission P2360215, namely (a) demolition of west gable boundary wall of the original dwelling house (b) the demolition of part of south boundary wall of the original dwelling house, (c) construction of base of extension to floor level. Also for planning permission to complete the works in relation to the above planning reference, namely (a) reconstruction of part demolished south facing wall, (b) the replacement of the old demolished walls with new modern build construction, (c) to complete the works to the remaining stone structure and (d) to complete the construction of the extension to the old dwelling. Note all finishes as per the original application and all other works as per the original application, including all necessary site works

Mullinavat , Kilkenny , X91 PR84

60m
19520CONDITIONAL25 Jul 2019

for the following works: Modifications including part demolition to the existing dwelling house along with the construction of a new extension to the rear and a new entrance porch and all associated site works

Garrandarragh , Mullinavat , Co. Kilkenny

127m
21733CONDITIONAL25 Aug 2021

for subdivision of site and erection of a bungalow

Garrandarragh , Mullinavat , Co Kilkenny

127m
2460475CONDITIONAL8 Oct 2024

for a single-storey private residence, splayed site entrance, driveway and all associated site works

Garrandarragh , Mullinavat , Co. Kilkenny

195m
2460453CONDITIONAL23 Sept 2024

to construct a single storey extension to the side and to raise the roof level on the existing rear section of our existing two storey dwelling and all associated works

Garrandarragh , Mullinavat , Co.Kilkenny

211m
21866REFUSED18 Oct 2021

is sought to erect a) a three storey nursing home building b) with vehicular access from public road c) a single storey ancillary services building d) parking areas and service yards e) sewage treatment plant and percolation area f) private borehole well supply. And all associated site development works and site boundary treatments at

Garrandarragh , Mullinavat , Co. Kilkenny

212m
18135N/A27 Feb 2018

Development of a multipurpose agricultural storage shed and associated site works

Garrendarragh , Mullinavat , Co Kilkenny

217m
2215CONDITIONAL13 Jan 2022

for the proposed demolition of existing single storey commercial building and the proposed erection of a fully serviced 2 storey end terrace 2 bedroom townhouse, boundary treatments, together with all associated site development works, all

Main Street , Mullinavat , Co Kilkenny

228m
18184CONDITIONAL20 Mar 2018

to demolish nine agricultural buildings and associated site works at

Garrendarragh , Mullinavat , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?