A 10 year planning permission for a solar PV development on a ca. 13Ha Site incorporating: • Solar panels on ground-mounted frames over an area of ca. 6.5 ha, string inverters, 1 no. containerised transformer unit, post and wire fencing, CCTV system with 4 no. pole mounted cameras and landscaping; • Underground electrical cables connecting the solar PV development to existing onsite substation. Proposed extension to existing onsite substation of 51.3sqm; • A temporary construction compound; and, • All associated ancillary site development works. The Site is located within the boundary of an Industrial Emissions Licensed facility regulated by the Environmental Protection Agency, Licence number P0359-03.
View the full application file on the council's planning portal →Application Timeline
Application received
19 May 2023
Decision: CONDITIONAL
11 Jul 2023
Decision due
13 Jul 2023
Grant issued
11 Aug 2023
Application Details
- Location
- Tirlan , Ballyconra Ballyragget , Kilkenny
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kilkenny County Council
- Site Area
- 13 ha
Timeline
- Registration Date
- 19 May 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 July 2023
- Grant Date
- 11 August 2023
- Permission Expires
- 10 August 2033
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the Proposed installation of a network connection and grid connection, and minor amendments to solar farms previously approved under planning application references 17/669 and 22/126. The proposed development will consist of the installation of a 33kV network connection between the solar farms approved under planning application references 17/669 and 22/126 comprising: c. 921m of overhead line and 9 No. wooden poles; onward connection of said approved solar farms to Ballyragget 38kV Substation by installation of a 38kV cable comprising c. 786m of underground cable and c. 395m of overhead line on 5 No. wooden poles; amendments to solar farm approved under planning reference 17/669 comprising removal of substation and replacement with solar panels; amendments to the layout of the substation approved under planning reference 22/126, and all associated site works
Ballyconra Parksgrove and Moatpark , Ballyragget , Co. Kilkenny
to construct (i) Slatted tank (ii) Calf shed and all associated site works
Ballyconra , Ballyragget , Co. Kilkenny
Of Planning Permission Reference 18/187
Ballyconra , Ballyragget , Co Kilkenny
to construct (i) milking parlour with collecting yard and handling/crush yard (ii) slatted tank (iii) over ground slurry tower (iv) cubicle area (v) meal bin and all associated site works at
Ballyconra , Ballyragget , Co. Kilkenny
for new foul effluent treatment system and percolation area and all associated site works
Ballyconra , Ballyragget , Co. kilkenny
for:(a) single storey temporary dwelling for 5 year period: (b) domestic store; (c) entrance; (d) replacement septic tank with percolation area and (e) retain and complete domestic garage/store and all associated site works
Ballyconra , Ballyragget , Co. Kilkenny
for development. The development will consist of an extension to an existing Above Ground Installation comprising additional 2.4 m-high palisade security fencing and 2.4 m-high paladin boundary fencing; a pedestrian access gate; an emergency pedestrian gate; internal concrete road pavement and gravelled areas; site lighting; all ancillary works and services including surface water drainage and landscaping
Ballyconra , Ballyragget , Co. Kilkenny
for a 10 year planning permission for a 17.346 Hectare Solar Farm, consisting of solar panels fixed to ground mounted steel frames, electricity control room, power inverter units, underground cable ducts, security fence, solar powered CCTV and lamp standard and all associated works. The solar farm will have an operational life of 40 years. Some of the Development is within the curtilage of Ballyconra House, a protected structure. A Natura Impact Statement will be submitted with the application
Parksgrove and Ballyconra , Ballyragget , Co. Kilkenny
for development at their Milk Processing Plant comprising: -Construction of a process building to accommodate two number evaporators, and associated equipment, associated plant and equipment rooms, roof mounted air handling equipment, a transformer enclosure and pipe and service bridges. -A link corridor connection to the existing Whey Factory. - Installation of 2 number water recovery silos affixed to concrete plinths. - Associated site works including earthworks, retaining walls, realignment of the existing internal roads to facilitate vehicle movements, drainage works and all associated site works including landscaping. This facility holds an industrial emissions licence issued by the Environmental Protection Agency
Ballyconra , Ballyragget , Co Kilkenny
for proposed works which will include a solar farm on an area of approximately 39.6 hectares, comprising photovoltaic panels on ground mounted frames, 20 no. single storey inverter/transformer stations, 1 no. onsite 38 KV substation, 2 no. steel storage containers, security fencing, CCTV and all associated ancillary development works. Elgin Energy Services Ltd, are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operational period of 30 years)