The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360205

N/A

Westmeath - Westmeath County Council

Proposed Development

construction of a 4 bedroom single storey dwelling split into 3 blocks located on the footprint of an historic cottage and turf shed, upgrade existing roadway to site, installation of a domestic sewage treatment system and percolation area and all necessary site works, landscaping and drainage. Dwelling located in proximity to ruinous mill, a monument (ref: WM024-189) included on the Sites and Monuments Record (SMR) for Co. Westmeath

View the full application file on the council's planning portal →

Application Details

Location
Ballinkeeny or Mosstown , Streamstown , Co. Westmeath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Westmeath County Council
Site Area
5.05 ha

Timeline

Registration Date
5 July 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

99m
2360216CONDITIONAL12 Jul 2023

construction of a 4 bedroom single storey dwelling split into 3 blocks located on the footprint of an historic cottage and turf shed, upgrade existing roadway to site, installation of a domestic sewage treatment system and percolation area and all necessary site works, landscaping and drainage. Dwelling located in proximity to ruinous mill, a monument (ref: WM024-189) included on the Sites and Monuments Record (SMR) for Co. Westmeath

Ballinkeeny or Mosstown , Streamstown , Co. Westmeath

508m
197161CONDITIONAL2 Aug 2019

Partial demolition of existing single storey cottage with internal and external alterations and the construction of a single storey extension adjoining existing cottage and replacing existing septic tank and percolation area with all associate site works

Ballinkeeny , Streamstown , Mullingar

547m
2660312N/A13 Jun 2026

RETENTION is sought for development which consists of a clay lined earthen bank lagoon with surround safety fence and ancillary works

Taghnafearagh House , Streamstown , Mullingar

694m
22452CONDITIONAL9 Sept 2022

RETENTION for one dwelling constructed in accordance with the incompleted Planning File No. 83/617, pumphouse and two number outbuildings, septic tank and percolation area and associated site works

Mosstown , Streamstown , Mullingar

1.3km
2116CONDITIONAL19 Jan 2021

Dwelling house, detached domestic garage, wastewater treatment system and percolation area, bored well and all associated site works

Bishopstown , Rosemount , Moate

1.7km
207030CONDITIONAL11 Feb 2020

Permission for development to remove condition No2 of Westmeath Register Reference: 11/4067 and to retain the change of use from private residential dwelling only to private residential dwelling available for short term lettings

Bishopstown House , Ballinaspick , Streamstown

1.8km
2460109REFUSED10 Apr 2024

construction of a dwelling house, domestic garage and septic tank with percolation area and all associated site works

Rathskeagh , Ballymore , Mullingar Co.Westmeath

1.8km
21289N/A25 May 2021

(i) Demolition of sections of existing cottage and alterations to elevations of same (ii) construction of a single-storey extension to existing cottage (iii) new treatment system and polishing filter (iv) new site entrance and all associated site works

Ballinaspick , Rosemount , Co Westmeath

1.8km
21486CONDITIONAL1 Sept 2021

(i) the conversion of a former rural dwelling into habitable accommodation involving (ii) demolition of sections of the former dwelling and alternations to the elevations of the structure (iii) construction of a single storey domestic extension to the structure (iv) new treatment system and polishing filter (v) new site entrance and all associated site works

Ballinaspick , Rosemount , Co. Westmeath

1.8km
2460041CONDITIONAL20 Feb 2024

construction of a slatted shed with concrete area’s with all ancillary site works

Killarecastle Ballinea , Mullingar , Co. Westmeath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?