2360210
CONDITIONALSligo - Sligo County Council
Proposed Development
construction of first floor extension (240m2 total floor area) to existing light industrial unit to provide ancillary office and staff accommodation to serve existing business with alterations to existing plans and elevations together with all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
15 Aug 2023
Further information requested
9 Oct 2023
Further information received
23 Oct 2023
Decision: CONDITIONAL
14 Nov 2023
Decision due
19 Nov 2023
Grant issued
18 Dec 2023
Application Details
- Location
- Unit 4B Union Road Business Park , Collooney , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.096 ha
Timeline
- Registration Date
- 15 August 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 November 2023
- Grant Date
- 18 December 2023
- Permission Expires
- 17 December 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of: (1) change of use to part of the undertakers business to use as a funeral home and crematorium, (ii) construction of a first floor mezzanine and stairs to be used as offices and storage ancillary to the business, (iii) proposed changes to fenestration to the front, south side and rear elevations to accommodate these changes, (iv) change of cladding to the first floor facades of the front and side elevations with window surrounds and louvres, (v) construction of a veranda to the front and south side, (vi) construction of a porte conchere to front entrance, (vii) proposed gas tank and air cooler unit in 2m high walled area located to the south, (viii) carrying out of all ancillary site works
Unit 3 , Union Road Business Park , Collooney
PR - For development consisting of retention of changes to the existing Warehouse comprising the following: (A) Changes to front (West) elevation of Unit No. 3 to comprise the replacement of a single loading door at grade with 2 No. Loading doors incorporating dock levellers and seals and personnel door with external galvanised steps and (B) Small single storey extension to the rear (East) of Unit No. 4 to comprise a loading dock with single loading door, dock leveller and associated loading ramp and external galvanised steps.
Sligo Chill Freeze , Rathrippon , Collooney
for elevation changes in the form of the installation of an aluminium brise soleil system on the west elevation, new external openings, new fenced compound, external store and site signage, together with all site ancillary works
Mayo Sligo and Leitrim ETB NZEB Centre of Excellence Unit 1 , Union Rd Business Park , Collooney Co. Sligo
Permission for new external openings, new fenced compound, external store and site signage, together with all ancillary works at Mayo, Sligo and Leitrim ETB NZEB Centre of Excellence, Unit 1, Union Rd, Business Park, Collooney, Co. Sligo, F91 E161.
Mayo Sligo and Leitrim ETB NZEB Centre of Excellence , Union Rd Business Park , Collooney Co. Sligo
development consisting of the change of use of existing warehouse unit, permitted under PL04/1470 to use as an Educational Training Centre with all associated works
Unit 1 , Union Road Business Park , Collooney
development consisting of the following: - (1) change of use & amalgamation of existing units 10, 11, 12 & 13 from warehouse & office space to light industrial unit which will be used to manufacture plastic products (floor area = 2293m2); (2) carrying out of alterations to elevations of existing building; (3) provision of first floor office space in existing building with additional floor area of 231m2; (4) construction of an extension to side elevation with additional floor area of 266m2, provision of 6 no. silos for raw material storage, each with a capacity of 99.7m3, a rain water harvesting tank and water chiller; (5) relocation of existing site entrance and construction of new boundary walls and fencing; (6) revised car parking layout and provision of loading bays; (7) signage & 3 no. flag poles and (8) carrying out of ancillary site development works
Units 10 11 12 & 13 GWI Business Park , Union Road , Collooney
Development consisting of the following; permission for subdivision of Unit No. 9 (total floor area 1726 m2) into 2 separate units and all associated works. Previous permission 04/1477 refers
Union Road , Collooney , Co Sligo
PP - for development consisting of the following: to carry out preliminary and preparatory site works for reduction of existing ground levels on site with temporary vehicle access, associated facilities all associated works.
Union Road , Collooney , Co. Sligo
development consisting of the following; Change of use at first floor level of circa. 484m2 from bathroom showroom to office space and all associated site development works and services provision
1 Union Rd , Rathrippon , Collooney
Development consisting of 1. Retain boundary wall (2.54m in height) and entrance as constructed 2. Retain hard surface measuring 1140 m2 and 748 m2 for the storage of metal and end of life vehicles respectively 3. Retain existing shed and office 4. Retain and complete partially constructed precious metals shed 5. All ancillary works associated with the above. A Natura Impact Statement (NIS) accompanies this application
Collooney Co. Sligo , , Collooney
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?