The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360210

N/A

Tipperary - Tipperary County Council

Proposed Development

alteration and extension, consisting of a single storey rear and side extension, hard and soft landscaping, together will all ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
26 Árd Coillte , Ballina , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.057 ha

Timeline

Registration Date
30 March 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
2360242CONDITIONAL14 Apr 2023

single storey rear and side extension which incorporates the existing garage and change of use of domestic garage to residential use, hard and soft landscaping with all ancillary site works

26 Árd Coillte , Ballina , Co. Tipperary

18m
18600833CONDITIONAL2 Jul 2018

to construct a) a single storey extension to the side and back of house and (b) new window at ground floor level on the East Elevation with internal alterations

No 25 Ard Na Coillte , Ballina , Co. Tipperary

20m
18600682N/A31 May 2018

(a) a single storey extension to the side and back of house and (b) new window at ground floor level on the East Elevation with internal alterations

No 25 Ard na Coillte , Ballina , Co Tipperary

31m
19600949CONDITIONAL28 Aug 2019

the construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, removal of the existing fireplace and chimney to install a new patio door, removal of the kitchen door to install a new window all to side elevations, installation of a new flue, together with all other associated site works

12 Willow Cliff , Ballina , Co. Tipperary

37m
19600850N/A30 Jul 2019

construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, installation of a new patio door to the side elevations, removal of the kitchen door and installation of new window to the side elevation, removal of existing fireplace and chimney and installation of stove flue, together with all other associated site works

12 Willowcliff , Ballina , Co Tipperary

43m
19600871N/A8 Aug 2019

the construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, removal of the existing fireplace and chimney to install a new patio door, removal of the kitchen door to install a new window all to side elevations, installation of a new flue, together with all associated site works

12 Willowcliff , Ballina , Co. Tipperary

85m
17601357REFUSED8 Dec 2017

construction of the final phase of the Ard Coillte housing development, approved under planning references 07/51/0573 & 08/51/0300 and extension of duration references 13/51/0027 & 13/51/0028. This phase of the development consists of 10 detached houses, 4 garages, connection to the public services, roads, footpaths, open space areas & ancillary site development works

Ard Coillte , Ballina , Co. Tipperary

85m
2431REFUSED23 Feb 2024

construction of the final phase of the Ard Coillte housing development, approved under planning references 07/51/0573 & 08/51/0300 and extension of duration references 13/51/0027 & 13/51/0028. This phase of the development consists of 10 detached houses, 4 garages, connection to the public services, roads, footpaths, open space areas & ancillary site development works

Ard Coillte , Ballina , Co. Tipperary

88m
2460546CONDITIONAL4 Jul 2024

construction of 9 detached houses, 1 garage and ancillary site works

Ard Coillte , Ballina , Co Tipperary

98m
17600423CONDITIONAL25 Apr 2017

construction of rear single storey extension to include conversion to part of existing detached garage. Insert 2 no. side windows to gable ground floor of existing house and all ancillary site works

32 Ard Coillte , Ballina , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?