2360272

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

to (a) retain extension to existing dwelling house as constructed on site, (b) upgrade the wastewater treatment system on site consisting of an Effluent treatment unit and soil polishing filter on site, (c) upgrade existing vehicular entrance together with all ancillary site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Oct 2023

  2. Decision: CONDITIONAL

    23 Nov 2023

  3. Decision due

    5 Dec 2023

  4. Grant issued

    8 Jan 2024

Application Details

Location
Greyfield , Culfadda , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.629 ha

Timeline

Registration Date
11 October 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 November 2023
Grant Date
8 January 2024
Permission Expires
7 January 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
2360246N/A14 Sept 2023

Planning Permission to (a) retain extension to existing dwelling house as constructed on site, (b) upgrade the wastewater treatment system on site consisting of an Effluent treatment unit and soil polishing filter on site, (c) upgrade existing vehicular entrance together with all ancillary site works and services at Greyfield, Culfadda, Co.Sligo.

Greyfield , Culfadda , Co. Sligo

211m
20417CONDITIONAL11 Dec 2020

development consisting of the construction of a 36 metre high multi-user lattice tower telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment and associated site works including new access track

Greyfield Td. , Culfadda , Co. Sligo

753m
20120CONDITIONAL20 Apr 2020

development consisting of (1) demolition of the existing extensions to front and rear of existing hall (2) construction of new extensions to the front, side and rear of existing hall, part of which is to be used as an after school facility (3) alteration and refurbishment of the existing hall (4) and all ancillary site works and services

Community Hall , Kiltyteige , Culfadda

1.5km
2560267N/A26 Jun 2025

PERMISSION FOR THE PROVISION OF A SINGLE STOREY EXTENSION TO THE FRONT OF AN EXISTING COTTAGE ACCOMMODATING A NEW KITCHEN/LIVING/DINING AREA, WC AND ENTRY HALL ALONG WITH ALL ANCILLARY SITE SERVICES

Roosky More , Culfadda , Ballymote

1.5km
2560288CONDITIONAL13 Jul 2025

provision of a single storey extension to the front of an existing cottage accommodating a new kitchen/living/dining area, wc and entry hall along with all ancillary site services and all associated site works

Roosky More , Culfadda , Ballymote

1.6km
18280CONDITIONAL17 Jul 2018

Development consisting of (1) demolition of a derelict dwelling house (2) construction of a new dwelling house and effluent treatment system along with all ancillary site works and services - CONDITION NO. 10 COMPLIED WITH - THE CORRECT AMOUNT OF DCs PAYABLE WAS €4,916.40 AND NOT €597.60 AS SHOWN ON FINAL GRANT OF PERMISSION

Tawnagh , Culfadda , Ballymote

1.8km
18168CONDITIONAL9 May 2018

For development consisting of the proposed construction of a new dwelling house, On - Site Waste Water Treatment System, proposed new vehicular access and all associated landscaping and site works

Listrush , Culfadda , Co. Sligo

1.9km
2360288CONDITIONAL24 Oct 2023

Planning permission for a renewable wind energy development of a one (1) turbine wind farm. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo. The development will comprise of one (1) electricity generating wind turbine, which will have an overall maximum tip height of 180 meters, comprising a tower of nominally 112 meters high, and rotor diameter of up to 136 meters. The development will consist of permanent access tracks, hardstandings, an electrical substation building, an underground cable trench and ancillary site works. The maximum output capacity of the wind farm will be c.3.5mw.

Riverstown , Gorteen , Co. Sligo

2.0km
2460344CONDITIONAL8 Oct 2024

demolition of existing ruins of house (non habitable) and shed and the construction of a new, detached, storey and a half dwelling house and detached domestic garage and installation of a new onsite wastewater treatment system and all ancillary works

Cloonena , Culfadda , Co. Sligo

2.0km
244CONDITIONAL25 Jan 2024

to construct a new dwelling house, effluent treatment system and all ancillary site works