2360287
N/ACarlow - Carlow County Council
Proposed Development
extension to existing commercial unit and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
8 Dec 2023
Further information requested
6 Feb 2024
Application withdrawn
6 Aug 2024
Application Details
- Location
- Tullow Road , Bennekerry , Co. Carlow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Carlow County Council
- Site Area
- 0.307 ha
Timeline
- Registration Date
- 8 December 2023
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 6 August 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
retention permission for an unauthorised mobile home used for storage/recreational area ancillary to the existing dwelling, connection to services, and all associated site works
Bennekerry , Tullow Road , Co. Carlow
the erection of 2 no. advertisement signs combined on a single frame and all associated site works
Bennekerry , Tullow Road , Carlow
Erection of 2 No. advertisement signs combined on a single frame and all associated site works
Bennekerry , Tullow Road , Carlow
the construction, of a new two-storey style dwelling house, proprietary sewage treatment system and percolation area, site entrance and connection to services and associated site works
Tullow Road , Bennekerry , Carlow
construct an extension to dwelling house. Permission to demolish previous built extensions to facilitate same works. Permission for necessary renovations to same house and associated site works.
Tullow Road , Bennekerry , Co. Carlow
development that would extend the existing metal recycling facility (permitted under Reg. Ref. 09/308) at the site of Flynn's Metal Recycling Ltd., Tullow Road, Bennekerry, Co. Carlow. The proposed development consists of: • The retention of an extended concrete yard, and a hardcore surface yard and its proposed upgrade to a concrete surface, to integrate with the use and operation of the existing metal recycling facility. • The retention of boundary treatments including palisade fence on retaining wall. • The retention of a weigh bridge and ancillary cabins. • The demolition of existing storage and ancillary buildings. • The erection of a new single storey pitched roof workshop and materials storage building, that will include a management office and staff welfare facilities, with solar panels at roof level. • The erection of portable block walls to form external bays to store segregated metals. • The creation of a new site access from the R725 and a gated entrance and the closure of the existing site entrance. • Site drainage works, boundary treatments, lighting, landscaping, parking areas for cars and trucks, signage and all other site development works above and below ground. • This will facilitate the increase in intake of waste materials to 17,500 Tonnes per annum.
Flynn's Metal Recycling Ltd , Tullow Road , Bennekerry
development that would extend the existing metal recycling facility (permitted under Reg. Ref. 09/308) at the site of Flynn's Metal Recycling Ltd., Tullow Road, Bennekerry, Co. Carlow. The proposed development consists of: • The retention of an extended concrete yard, and a hardcore surface yard and its proposed upgrade to a concrete surface, to integrate with the use and operation of the existing metal recycling facility. • The retention of boundary treatments including palisade fence on retaining wall. • The retention of a weigh bridge and ancillary cabins. • The demolition of existing storage and ancillary buildings. • The erection of a new single storey pitched roof workshop and materials storage building, that will include a management office and staff welfare facilities, with solar panels at roof level. • The erection of portable block walls to form external bays to store segregated metals. • The creation of a new site access from the R725 and a gated entrance and the closure of the existing site entrance. • Site drainage works, boundary treatments, lighting, landscaping, parking areas for cars and trucks, signage and all other site development works above and below ground. • This will facilitate the increase in intake of waste materials to 17,500 Tonnes per annum
Flynn's Metal Recycling Ltd , Tullow Road , Bennekerry
outline planning permission for the construction of a two-storey dwelling house, garage, new site entrance and connection to public services
Bennekerry , Co. Carlow
the construction of a dormer dwelling house, garage, new site entrance and connection to public services
Bennekerry , Co. Carlow
the construction of a dormer dwelling house, garage, new site entrance and connection to public services
Bennekerry , Carlow , Co. Carlow
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?