2360374
N/AClare - Clare County Council
Proposed Development
to RETAIN development at the Armada Hotel, Spanish Point, Miltown Malbay,Co. Clare. The development consists of a replacement treatment plant and associated works for use by the Armada Hotel.
View the full application file on the council's planning portal →Application Timeline
Application received
15 Sept 2023
Application withdrawn
8 Nov 2023
Decision due
9 Nov 2023
Application Details
- Location
- Spanish Point , Miltown Malbay , Co Clare
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
- Site Area
- 0.05 ha
Timeline
- Registration Date
- 15 September 2023
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 9 November 2023
- Withdrawn
- 8 November 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to RETAIN indefinitely the existing Snug and Covered Smoking Area to the front of the building. To RETAIN indefinitely the existing Store on the West side of the building and for PERMISSION to alter to incorporate an external door. For PERMISSION to Construct two new Stores, one on the West side and one on the East side and to extend the existing ground storey offices, all at the Armada Hotel, Spanish Point, Co. Clare
Spanish Point , Co. Clare
for the following a) to construct an extension and outside winter garden area to the bar/dining room area on the south elevation b) to construct an extension and outside terrace area to the pre-wedding reception area on the south elevation along with associated site works
Armada Hotel , Spanish Point , Co Clare
to install a new wastewater treatment plant and polishing filter to serve the existing Armada Hotel Complex along with associated site works. The application will be accompanied by a Natura Impact Statement
Armada Hotel , Spanish Point , Co Clare
of the wastewater treatment plant serving the existing Armada Hotel Complex along with associated site works
Armada Hotel , Spanish Point , Co Clare
to construct/install a cabin to be used as short-term tourist accommodation ancillary to the existing Armada Hotel Complex and to install a waste water storage tank along with associated site works
Armada Hotel , Spanish Point , Miltown Malbay
to construct a ESB Substation and a new screen to the external store area along with associated site works ancillary to the existing Armada Hotel Complex
Armada Hotel , Spanish Point , Co Clare
to construct a standalone structure that will be used for offices and storage ancillary to the existing Armada hotel Complex along with associated site works
Armada Hotel , Spanish Point , Co Clare
to alter the elevations of an existing office an to change its use from an office to a cafe ancillary to the existing Armada Hotel Complex along with associated site works
Armada Hotel , Spanish Point , Co Clare
for development at this site at the Armada Hotel and Armada House (which is a protected structure, RPS No. 025), Spanish Point, Miltown Malbay, Co. Clare. The development will consist of – 1) The construction of an under-ground wastewater treatment plant including associated overground plant, 2) The construction of an under-ground pumping station, and 3) All associated site development works, including underground piping, landscaping and the decommissioning and removal of the existing wastewater treatment plant. This planning application is accompanied by a Natura Impact Statement (NIS)
Armada Hotel and Armada House , Spanish Point Miltown Malbay , Co. Clare
for development at this site; Armada House, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The development will consist of the provision of a footpath between Armada House and the R482. The development will also include for associated landscaping, public lighting, the opening of a new 2m wide pedestrian access that links to the public footpath as well as all ancillary works.
Armada House , Leagard South , Spanish Point Co. Clare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.