2360390

CONDITIONAL

Clare - Clare County Council

Proposed Development

for the construction of single storey extensions to the side and rear of existing dwelling house, installation of new upgraded waste water treatment system with polishing filter together with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Sept 2023

  2. Decision: CONDITIONAL

    14 Nov 2023

  3. Decision due

    16 Nov 2023

  4. Grant issued

    21 Dec 2023

Application Details

Location
Greystones , Lackyle , Ardnacrusha
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.19 ha

Timeline

Registration Date
22 September 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 November 2023
Grant Date
21 December 2023
Permission Expires
20 December 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

188m
19957CONDITIONAL6 Dec 2019

for the construction of a link corridor at the rear of the dwelling to connect the dwelling and garage, conversion of a garage into an en-suite bedroom and construction of a garden and fence to the front of the dwelling. RETENTION permission is also being sought for the replacement of a door and window with a single window to the front of the dwelling

Lakyle , Ardnacrusha , Co Clare

212m
211232CONDITIONAL19 Nov 2021

for development on lands located within the site of the Ardnacrusha Generating Station, Castlebank, Ardnacrusha, Co. Clare, Eircode V94 VR0K, in the townland of Ballykeelaun. The development consists of upgrading works to the electricity network within the site comprising: (a) 1 No. new 38kV line/cable interface mast (with a maximum height of c.16m above ground) on the existing Ardnacrusha Nenagh-Birdhill 38kV line; (b) 1 No. new 38kV line/cable interface mast (with a maximum height of c.16m above ground) on the existing Ardnacrusha - Moylish line and an additional c. 30m of overhead line connecting to an existing overhead line; (c) 1 No. temporary 38kV structure (with a maximum height of c.16.55 m above ground) on the existing Ardnacrusha - Tulla / Ardnacrusha - Birdhill 38kV line to remain in place for up to 5 years while works area ongoing (d) all ancillary development. For information purposes only: associated development works include the removal of existing overhead line structures and the undergrounding and/or relocation of existing overhead lines on the site. Such works comprise exempted development, having regard to the provisions of Section 4(1)(g) of the Planning Act (as amended) and Class 28 of the Planning and Development Regulations 2001 (as amended) respectively, and as such are not subject to this application. The proposed works are to existing networks assets located within the site at Ardnacrusha Generating Station - a Protected Structure (Reference No 311) under the Clare County Development Plan, 2017-2023. No works are proposed to the Protected Structure

Ardnacrusha Generating Station , Castlebank , Ardnacrusha Co Clare

226m
211201N/A12 Nov 2021

of change of use of garage area to a habitable area and car port at the side of the house at his residence

Doncla House , Lackyle , Ardnacrusha

226m
26213N/A30 Jul 2026

to retain conversion of garage to habitable area assciated with the existing dwelling house

Doncla House , Lackyle , Ardnacrusha Co Clare

296m
19638CONDITIONAL7 Aug 2019

for the construction of a single storey extension to the rear of existing dwelling, the replacement of the existing roof structure with installation of rooflights to both front and rear pitches, alterations to the existing front façade and ancillary site works

Castlebank , Ardnacrusha , Co. Clare

316m
2460642CONDITIONAL16 Dec 2024

of the domestic store at the side of the dwelling and retention permission for extension to the dwelling at the rear and all associated site works

Castlebank , Ardnacrusha , Co. Clare V94 YK6P

366m
19118CONDITIONAL18 Feb 2019

to construct garage and all associated site works

Castlebank , Ardnacrusha , Co. Clare

379m
191013CONDITIONAL23 Dec 2019

to RETAIN a development at Cois Sionna, Lackyle, Ardnacrusha, Co Clare. The development consists of a) The connection of an unauthorized garage and home office/study to an existing dwelling, b) an unauthorized extension linking the existing unauthorized garage to the existing dwelling house, c) an unauthorized enclosed porch to the front of the dwelling house, d) an unauthorized connection to an existing foul sewer. The Permission to RETAIN is being sought for an unspecified period of time

Lackyle , Ardnacrusha , Co Clare

405m
2298CONDITIONAL7 Feb 2022

for a preschool facility, entrance and all associated site works

Castlebank , Ardnacrusha , Co Clare

407m
2348CONDITIONAL1 Feb 2023

for a Medical Centre and all associated site works

Castlebank , Ardnacrusha , Co Clare