2360416
REFUSEDWestmeath - Westmeath County Council
Proposed Development
construction of a single storey dwelling, install a proprietary wastewater treatment system and all associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Nov 2023
Decision: REFUSED
1 Feb 2024
Decision due
2 Feb 2024
Application Details
- Location
- Raheenquill , Tyrrellspass , Co. Westmeath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Westmeath County Council
- Site Area
- 0.794 ha
- Floor Area
- 170 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 30 November 2023
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 1 February 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a single storey dwelling, install a proprietary wastewater treatment system and all associated site development works
Raheenquill , Tyrrellspass , Co. Westmeath
(a) renovate & extend to rear of existing single storey dwelling, (b) demolish existing rear extension & attached garage (c) decommission existing septic tank & install a proprietary wastewater treatment system and all associated site development works
Rahincuill , Tyrrellspass , Co. Westmeath
Construct a single storey extension to the side of existing dwelling & internal modifications to create a multi-generational home, demolition of existing shed, decommissioning of existing septic tank, installation of a new effluent treatment system and percolation area and all ancillary site services.
Rahincuill , Tyrellspass , Co. Westmeath
a single storey extension to the side of existing dwelling & internal modifications to create a multi-generational home, demolition of existing shed, an effluent treatment system and percolation area and all ancillary site services
Rahincuill , Tyrellspass , Co. Westmeath
The development comprises 275MWe reserve gas-fired generator to boost and back up the power system and will include the following elements (a) 5no. open cycle gas turbine (OCGT) modules (each module being c 1042sqm) and complete with lube oil coolers, generators, air intake vents, continuous emissions monitoring (CEMS) technology, selective catalytic reduction (SCR) units and c.30m high stacks, (b) 1no two-storey administration building (32.615m long x 13m wide x 9.33m high) which contains a control room, offices, storage meeting room workshop and double height warehouse (c) 2no. 2,400m3 capacity bunded secondary fuel storage tanks (each with a diameter of 17.6m and height of 10m), (d) a fenced above ground installation (AGI) compound containing gas pipework , a regulator house enclosure, instrument kiosk, boiler house enclosure and analyzer kiosk, (e) 1no. fuel pump and filter unit, (f) 1no. containerised water treatment module (12.192m long x 2.438m wide x 2.896m high), (g) 1no. 10m3 purified water storage tank (2.75mm high and 2.27m diameter), (h) 2no. containerised black start diesel generators (2.438m x 12.192m long x 2.896m high) with integrated stacks(4.755m high), (i) 1 no 50m3 ammonia storage tank (9.360m high and 3.16m diameter, (j) fire pump skid building (9.23m long x 6.98m wide x 4.6m high), (k) 1 no. 500m3 capacity water tank (7.597m high x 10m diameter, (l) 1 no. single storey IPP building (20m long x 10m wide and 6.853m high, (m) 1 no. low voltage (LV) bunded house transformer (1.914m high), (n) 5 no. medium voltage (MV) bunded step-up transformers (6.287 m high) 1no. high voltage (HV) customer compound containing 2no. bunded transformers (9m high) connected to electrical equipment, (o) 1no air compressor building (8.33m long x 4.73m wide x 4.517m high) and (p) all ancillary development including new access road, internal roads, 2.65m high fencing and gates securing the main reserve generator site, and associated engineering works to provide for the connection of site services and for the treatment and disposal of foul wastewater and surface water. The development includes for construction of a new entrance to the site from the R446 with associated signage and an access road from the new entrance to the reserve gas-fired generator. The development also includes for the demolition and removal of a farm shed, farm workshop, feed silo and a silage clamp , permission for a period of 10 years EIAR and Industrial Emissions licence included.
Kiltotan and Collinstown and Oldtown , Rochfortbridge , Co Westmeath
development which will consist of alterations to the development consented under Westmeath Planning Case Ref. 21/515 (parent permission) and are as follows: (i) reconfiguration of structures and pipework within the above ground installation (AGI) compound, (ii) increase the size of gas oil (secondary fuel) storage tanks and bund and realignment of tanks within the bund, (iii) remove one consented emergency diesel generator from the development layout and reposition of the second consented emergency diesel generator alongside an LV switchroom, (iv) reposition palisade fence associated with ancillary equipment compound approximately 15m to the west, (v) reconfigure and reposition fuel pumps (polishing and forwarding), MCC equipment, fire water pump, fire water tank and air compressor adjacent to the southern side of the secondary fuel storage bund, (vi) remove water treatment module and ammonia storage tank from the development layout, (vii) remove two distribution transformers from the development layout and reposition the remaining three consented distribution transformers to the ancillary equipment compound to the west, (viii) remove five gas turbine selective catalytic reduction (SCR) units and associated ancillary components (fans), (ix) reposition of two high voltage (HV) transformers within the HV transformer compound and installation of a third HV transformer in lieu of the HV transformer consented under Planning Permission Ref. 21/532, and (x) associated minor changes to internal roads, civil engineering, drainage, landscaping, lighting, car parking, and site works. The development alterations relate to Westmeath Planning Case Ref. 21/515, which is a development that is for an activity requiring an Industrial Emissions Licence from the Environmental Protection Agency (EPA)
Kiltotan and Collinstown and Oldtown , Rochfortbridge , County Westmeath
alterations to front elevation of existing house by adding dormer type windows to first floor rooms, new front porch at ground floor level and carry out all ancillary site works.
Raheenquill , Tyrrellspass , Co.Westmeath
development which will consist of (i) the construction of a new Administration/Control Building at a new location within the site in lieu of the IPP Building granted under planning Ref. No. 21/515, (ii) the construction of a new Workshop Building at a new location within the site in lieu of the Administration/Workshop Building granted under Planning Ref. No. 21/515, and (iii) associated minor changes to internal roads, civil engineering, drainage, landscaping, lighting, car parking, and site works. The development alterations are with respect to Planning Ref No. 21/515, which is a development that is for the purpose of an activity requiring an Industrial Emissions Licence from the Environmental Protection Agency (EPA)
Kiltotan and Collinstown and Oldtown , Rochfortbridge , Co. Westmeath
new two storey dwelling house, domestic garage, new vehicular entrance, septic tank & percolation area and all ancillary site services.
Garrane Lower , Tyrrellspass , Co.Westmeath
The Energy Storage System (ESS) development will comprise: (i) an open area battery energy storage system (BESS) compound(area of 26,317sqm) containing 264no battery modules and associated medium voltage power station (MVPS) enclosures (12.192m long x 2.438m wide x 3.896m high), (ii) IPP building (40n long x 10m wide x 6.853m high), (iii) synchronous condenser compound (area of 9,309sqm) containing a horizontal synchronous generator positioned within a building (30.0m long x 18.0m wide x 12.15m high), 5no control modules each (12.192m long x 2.438m wide x 3.332m high), associated bunded transformers and electrical plant, (iv) high voltage (HV) customer compound containing 1no. bunded transformers (9m high) and electrical plant to provide for connection to the electricity transmission system, and (v) all ancillary development, including lightening mast protection, perimeter fencing with access gates, landscaping, lighting, car parking, internal access roads and all civil engineering works for the disposal of foul and surface water. The development includes for construction of a new entrance and access road to the facility from the R446 with associated signage from the new entrance to the ESS facility. Permission is sought for 10 years. An EIAR has been prepared and accompanies this planning application
Kilotan and Collinstown and Oldtown , Rochfortbridge , Co Westmeath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?