The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360436

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

house, carport and storage sheds as constructed

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jun 2023

  2. Decision: CONDITIONAL

    10 Aug 2023

  3. Decision due

    14 Aug 2023

  4. Grant issued

    13 Sept 2023

Application Details

Location
Cloonanagh , Capparoe , Nenagh
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.188 ha
Floor Area
234 sq m
Residential Units
1

Timeline

Registration Date
20 June 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 August 2023
Grant Date
13 September 2023
Permission Expires
12 September 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

58m
2360224CONDITIONAL6 Apr 2023

the demolition of existing substandard dwelling house, construction of a replacement dwelling house, garage, installation of a new domestic wastewater treatment system with polishing filter together with all associated site works

Cloonanagh , Capparoe Nenagh , Co. Tipperary

137m
211039CONDITIONAL16 Jul 2021

construction of a storey-and-half dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works

Erinagh , Capparoe , Nenagh

313m
2660776N/A10 Aug 2026

partial demolition to the rear of the existing building and the construction of a 4-bed dwelling and also a driveway, landscaping, septic tank and percolation system and all associated site works and services.

Cranahurt Capparoe , Nenagh , County Tipperary

349m
2561071CONDITIONAL23 Oct 2025

the construction of a new dwelling, with a new garage, a new entrance, along with a new well and a new treatment plant system and percolation area and all associated site works

Shragh , Capparoe , Nenagh

434m
2376CONDITIONAL22 Mar 2023

(i) construction of a slatted livestock unit, proposed slatted unit to incorporate associated underground slurry storage tank with external agitation points and ancillary concrete, (ii) construction of a calf shed and (iii) construction of a partially walled dungstead with all associated ancillary site works

Sragh , Capparoe , Nenagh Co. Tipperary

440m
2346N/A24 Feb 2023

(i) construction of a slatted livestock unit, proposed slatted unit to incorporate associated underground slurry storage tank with external agitation points and ancillary concrete, (ii) construction of a calf shed and (iii) construction of a partially walled dungstead with all associated site works

Sragh , Capparoe , Nenagh Co. Tipperary

679m
2360679CONDITIONAL29 Aug 2023

an extension to existing house and upgrade of the wastewater treatment system

Erinagh , Capparoe , Nenagh

804m
2460887N/A16 Oct 2024

a two-storey pitched roof extension at the rear, featuring three dormer windows. The attic level will include three new bedrooms, two of which will have en-suite bathrooms. The ground floor will comprise a new kitchen area, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing building to the new two-storey extension, creating a new hallway and incorporating a disabled WC and a bathroom. Additionally, there will be two gable windows on the new attic level, one on each side

Boherbaun Capparoe , Nenagh , Co. Tipperary

831m
2460932N/A31 Oct 2024

a two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing dwelling to the new two-storey extension, incorporating a new hallway, a bathroom, and a disabled WC. The attic level will include two gable windows (one on each side). Installation of a new wastewater treatment system, including a septic tank and percolation area, along with a new soakaway

Boherbaun Capparoe , Nenagh , Co. Tipperary

831m
2461094CONDITIONAL12 Dec 2024

two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing dwelling to the new two-storey extension, incorporating a new hallway, a bathroom, and a disabled WC. The attic level will include two gable windows (one on each side). Installation of a new wastewater treatment system, including a septic tank and percolation area, along with a new soakaway

Boherbaun Capparoe , Nenagh , Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?