The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360468

N/A

Tipperary - Tipperary County Council

Proposed Development

change of use at first floor level from commercial and domestic dwelling to residential to accommodate 2 no. one-bed apartments, make modifications to existing elevations and all associated site development works

View the full application file on the council's planning portal →

Application Details

Location
53 & 54 , New Street , Carrick-on-Suir
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.03 ha

Timeline

Registration Date
28 June 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
2360493CONDITIONAL6 Jul 2023

the modifications to previously granted planning application 08/560006 indefinitely and permission for change of use at first floor level from commercial and domestic dwelling to residential to accommodate 2 no. one-bed apartments and all associated site development works

53 & 54 New Street , Carrick on suir , Co. Tipperary

36m
17601157N/A20 Oct 2017

forming a new single access wicket gate to the north boundary wall of property leading onto St. Nicholas car park

No 6 William Street , Carrick-on-Suir , Co. Tipperary

36m
17601208REFUSED3 Nov 2017

forming of a new single access wicket gate to the north boundary wall of his property leading onto St. Nicholas car park

No. 6A William Street , Carrick-on-Suir , Co. Tipperary

48m
2560677REFUSED15 Jul 2025

a change of use from commercial ancillary space to office reception & office space at ground floor level, a change of use from ancillary storage to office space at first floor level, retention of minor layout configuration changes at first floor level & associated site works

Granary Business Centre , Greenside South Carrick On Suir , Co. Tipperary

51m
2560603N/A24 Jun 2025

change of use from commercial ancillary space to office reception & office space at ground floor level, a change of use from ancillary storage to office space at first floor level, retention of minor layout configuration changes at first floor level & associated site works

Granary Business Centre , Greenside , Carrick on Suir

55m
201586CONDITIONAL23 Dec 2020

development of a hotel and ancillary accommodation including retention and completion of demolition works at Figgertys Bar No. 6 New Street, demolition of existing two storey office and residential buildings at No’s. 5, 7 & 8 New Street, Carrick on Suir; Erection of new three storey over basement Hotel comprising: Basement function suite, Bar, Courtyard, cold rooms, kitchen, Plant rooms, stores office, toilets; Ground Floor reception, bars, lounge, terrace, toilets, restaurant, meeting room, kitchen, stores, staff room; First floor 20 en-suite bedrooms, store rooms; Second floor 20 en-suite bedrooms, store rooms; vehicle access from New Street, on site car parking, service yard, plant rooms, refuse enclosure, roof mounted PV panels, hotel signage and connection to public services

5-8 New Street , Carrick On Suir , Co. Tipperary

63m
211580CONDITIONAL28 Oct 2021

change of use from retail to residential together with elevational changes, connection to on site services and all associated site works

1 Parkside , Pill Road , Carrick-on-Suir

70m
19600638N/A7 Jun 2019

extend the permitted use of 45 new Street Carrick on suir Co Tipperary to include after school study

45 New Street , Carrick on suir , Co Tipperary

71m
19600730REFUSED1 Jul 2019

extend the permitted use from existing office to include after school study

45 New Street , Carrick on Suir , Co. Tipperary

74m
17601081CONDITIONAL2 Oct 2017

a change of use of the following: ground floor restaurant to 1 no 2 bed apartment, first floor of maisonette to 1 no 2 bed apartment and second floor of maisonette to 1 no 1 bed appartment with planning permission for a new balcony and associated site works.

16 New Street , Carrick on Suir , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?