The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2360900

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

a new house, entrance and waste water treatment system with all associated site works including restoration of the existing old cottage as an outbuilding

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Nov 2023

  2. Further information requested

    11 Jan 2024

  3. Further information received

    22 Feb 2024

  4. Decision: CONDITIONAL

    15 Mar 2024

  5. Decision due

    20 Mar 2024

  6. Grant issued

    18 Apr 2024

Application Details

Location
Garranlea , New Inn , Cashel
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.384 ha

Timeline

Registration Date
10 November 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 March 2024
Grant Date
18 April 2024
Permission Expires
17 April 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

86m
2163CONDITIONAL22 Jan 2021

alter and extend our existing dwelling. The works include single storey rear extension comprising reception room, dining room, rear entrance and storage space together with associated site works and drainage

Garranlea , New Inn , Cashel

86m
2260744CONDITIONAL28 Dec 2022

existing greyhound kennels as built to rear of existing dwelling

Garranlea , New Inn , Cashel Co. Tipperary

94m
2117N/A11 Jan 2021

alter and extend our existing dwelling. The works include single storey rear extension comprising reception room, dining room, rear entrance and storage space together with associated site works and drainage

Garranlea , New Inn , Cashel

470m
2460107CONDITIONAL18 Feb 2024

1) the construction of a two storey extension to the rear of the single storey cottage and the demolition of a single storey component to the rear elevation of the cottage, 2) various alterations and improvement works to the interior layout, exterior facades and roof structures to the cottage and the demolition of two single storey dilapidated outbuildings, 3) the installation of a certified wastewater treatment system and a percolation area, to all appropriate standards, 4) the construction of a site entrance in the location of an agricultural site entrance (the agricultural site entrance and a separate vehicular site entrance will be demolished, there will be improvement and realignment works to the front boundary wall), 5) the construction of garden walls, driveway, parking areas, footpaths and hard landscaping areas (the landscaping of the site consisting of new lawn areas, planting beds, hedging, trees and shrubbery and all associated site works) and RETENTION PERMISSION for the material change of use of an existing agricultural building to a home office

Garranlea , New Inn , Cashel Co. Tipperary

490m
2360139CONDITIONAL1 Mar 2023

(i) a storage shed & (ii) the extension of the existing peddle go-karting track at our existing open farm development.

Marlhill , Cashel , Co. Tipperary

490m
18600007CONDITIONAL3 Jan 2018

an open farm development, the development will consist of (I) a new building with café, seating area, toilets, indoor children's play area and ancillary accommodation (ii) the change of use of an existing farm building to animal housing and display building, animal feed and bedding store, covered dung store, (iii) the change of use of an existing building to a store, feed and bedding room for the animals, (iv) the change of use of an existing hay barn to an outdoor children's playground as well as the closing in of 3 sides of the building, (v) car & bus park, (vi) vehicular entrance, (vii) external children's play areas (viii) animal pens & walkways (ix) waste water treatment system, (x) effluent storage tank and (xi) all associated site development works

Marlhill , New Inn , Cashel

680m
21202CONDITIONAL19 Feb 2021

construction of a dwelling house, domestic garage, effluent treatment system and percolation area, entrance and all other associated site works

Garranlea , New Inn , Cashel

708m
18601153CONDITIONAL21 Sept 2018

the following changes to previously approved permission (Ref 17600155) 1. change of location of previously approved vehicular entrance 2. Single-storey extension to side of previously approved storey and a half extension. 3. Change of previously approved site extents and site boundaries and all associated site development works including percolation area

Garranlea , New Inn , Cashel

712m
17600155CONDITIONAL20 Feb 2017

construction of new storey and a half extension, alterations to existing house, to create an integrated granny flat, with packaged waste water treatment system and polishing filter, relocation of existing vehicular entrance and associated site boundary and development works

Garranlea , New Inn , Cashel

771m
21532CONDITIONAL21 Apr 2021

(a) construct an extension to the dwelling (b) construct a new site entrance and (c) to construct a septic tank and percolation area and including all associated site works

Marlhill , New Inn , Cashel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?