Proposed Development
a change of use of a vacant ground floor commercial unit to a one bedroom residential unit measuring 45m2. This will involve (a) elevational changes, (b) internal modifications, (c) connection to public utilities, (d) associated site services and works
View the full application file on the council's planning portal →Application Timeline
Application received
20 Nov 2023
Further information requested
19 Jan 2024
Further information received
23 Feb 2024
Decision: CONDITIONAL
27 Mar 2024
Decision due
7 Apr 2024
Grant issued
30 Apr 2024
Application Details
- Location
- The Square Cork Road , Newport , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.006 ha
Timeline
- Registration Date
- 20 November 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 March 2024
- Grant Date
- 30 April 2024
- Permission Expires
- 29 April 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(a) the interconnection of 2 no. existing buildings to extend the existing pharmacy, associated staff facilities and storage at ground floor and basement floor levels, (b) interconnection of the 2 no. existing buildings to create 1 no. 2 bedroom apartment at first floor level, (c) associated alterations to existing buildings external alterations to accommodate proposed new internal layout and reconfiguration, (d) new shop frontage complete with illuminated building signage, (e) all associated site works. Retention Permission for the existing external illuminated pharmacy sign
Hackett's Pharmacy , The Square , Tullow Newport
a stone faced pedestrian bridge over Cully River
Pound Street , Rose Hill , Newport
a stone faced pedestrian bridge over Cully River
Pound Street , Rose Hill , Newport
demolition and reconstruction of existing derelict and structurally unsafe building to provide for a 3 bedroom town house, construct 2 no. 2 bed apartments, connection to existing services, provision of rainwater retention system and associated site development works
Ivy House , The Square , Newport
demolition and reconstruction of existing derelict and structurally unsafe building to provide for a 3 bedroom town house, construct 2 no. 2 bed apartments, connection to existing services, provision of rainwater retention system and associated site development works
Ivy House , The Square , Newport
change of use from office to fitness centre/gym
Arrabawn , 1st Floor Custom Gap Road/Jail Street , Tullow Newport Co. Tipperary
the construction of an extension and to carry out minor elevational modifications to existing dwelling house including all ancillary site works
Jail Street , Newport , Co. Tipperary
change of use of former butchers shop premises to fast food take-away including extract ducting to rear elevation and all associated site works as may be required
27 Main Street , Newport , Co. Tipperary
change of use of former shop premises previously in use as a butchers shop to fast food take-away, extract ducting to rear elevation, new entrance ramp in place of existing steps at front door, all associated siteworks as may be required
27 Main Street , Newport , Co Tipperary
revised location of existing site boundary along the north west of the site. Construction of a new boundary wall in the revised boundary location, relocation of existing tennis court, revisions to existing site entrance and all ancillary site works
Clonbealy , Newport , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?