The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2361023

CONDITIONAL

Galway - Galway County Council

Proposed Development

for part change of use of ground floor plan to incorporate an off-licence to the rear of the existing shop. The gross floor space of the proposed works is 12.2sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Aug 2023

  2. Decision due

    24 Oct 2023

  3. Decision: CONDITIONAL

    24 Oct 2023

  4. Grant issued

    4 Dec 2023

Application Details

Location
Barnaderg South , Tuam , Co. Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.1 ha

Timeline

Registration Date
30 August 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 October 2023
Grant Date
4 December 2023
Permission Expires
3 December 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20716CONDITIONAL11 Jun 2020

for retention of shop storage building and all associated site works at the above location. Gross floor space to be retained 273.32 msq.

Barnaderg South , Tuam

49m
2361093CONDITIONAL13 Sept 2023

for the development that will consist of the demolition of existing derelict buildings & the construction of a dwellinghouse, domestic garage, wastewater treatment system & all associated site works. Gross floor space of proposed works: 197 sqm (house) & 22 sqm (garage)

Barnaderg South , Barnaderg , Tuam

168m
2461421CONDITIONAL24 Oct 2024

for the construction of a new dwelling house, domestic garage/fuel store, treatment system/septic tank, percolation area and all ancillary site development works. Gross floor space of proposed works: 270 sqm (H), 60 sqm (G)

Knock , Barnaderg , Tuam

185m
191639CONDITIONAL22 Oct 2019

for development consisting of the construction of an astroturf pitch with perimeter fencing and flood lighting, children's playground and all associated car parking, drainage, boundary treatments and site works

Knock ,

187m
20142CONDITIONAL7 Feb 2020

of 1. existing dwelling house and section of storage shed No 1 as per site plan on a site with revised boundaries. 2. To construct extension to side of existing house. 3. To demolish and remove section of storage shed No 1, to demolish and remove storage shed No 2 as per site plan. 4. For new treatment system / septic tank, percolation area and all ancillary site development works. Gross floor space of proposed works: 105 sqm. Gross floor space of work to be retained: 185.50 sqm. Gross floor space of any demolition: 58 sqm

Knock ,

220m
2660811CONDITIONAL22 May 2026

for the construction of a dwelling house, detached garage, treatment plant and percolation area and all associated works

Barnaderg South , Tuam , Co .Galway

368m
2487CONDITIONAL26 Mar 2024

for flood lighting to the main pitch including all ancillary site development works

Knock , Barnaderg , Tuam

369m
181474CONDITIONAL18 Oct 2018

for 1) construction of a sports wall incl. all ancillary site development works. 2) for flood lighting to main pitch incl. all ancillary site development works. 3) retention of Ball Catch Netting to rear of both goals on main pitch.

Knock ,

446m
24138CONDITIONAL21 May 2024

for (1) the location of the existing house, septic tank and driveway entrance all on revised site boundaries from that previously granted under historical planning Ref No 16908. 2. Construction of an extension to the rear of the house. 3. Minor elevation & plan changes as indicated on drawings, incl. all ancillary site development works. Gross floor space of proposed works: 23.50 sqm. Gross floor space of work to be retained: 182 sqm

Barnaderg South , Tuam , Co Galway

525m
171585CONDITIONAL3 Nov 2017

for an extension to an existing national school and associated services. Gross floor space of proposed works 50sqm.

Barnaderg North ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?