to: (1) construct 2 No. Warehouse Units with Entrance via existing site entrance onto the Ennis Road R458. (2) Provision for pedestrian connection to existing footpath along the Ennis Road (R458). Connection to public mains water infrastructure, including connection to existing surface water, foul drainage networks to serve the development. Provision of communal open space areas, bicycle parking, footpaths, public lighting, revised boundary treatments, together with all associated site works and services. Gross floor space of proposed works: 1,258.00 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Nov 2023

  2. Further information requested

    1 Feb 2024

  3. Further information received

    23 Apr 2024

  4. Decision: CONDITIONAL

    17 May 2024

  5. Decision due

    20 May 2024

  6. Grant issued

    24 Jun 2024

Application Details

Location
Rindifin , Ennis Road Gort (R458) , Gort Co.Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.54 ha

Timeline

Registration Date
29 November 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 May 2024
Grant Date
24 June 2024
Permission Expires
23 June 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

61m
211444REFUSED6 Aug 2021

for the construction of a housing development comprising of 20 no. residential units at Rindifin, Ennis Road (R458), Gort, Co. Galway. The development will consist of: - 10 no. Type "A" units - 4 bed semi-detached (2 storey) - 8 no. Type "B" units - 6 no. 1 bed & 2 no. 2 bed duplex apartment units, within a 2 storey block - 2 no. Type "C" units - 2 no. 1 bed semi-detached units (single storey). The proposed development includes; - Alterations to existing entrance onto Ennis Road (R458) and construction of access road. - Provision for pedestrian connections to existing footpath along Ennis Road (R458). - Connection to public mains water infrastructure, including connection to existing surface water, foul drainage networks to serve the development. - Provision of communal open space areas, a playground, private open space, bicycle parking, footpaths, public lighting, soft and hard landscaping, revised boundary treatments, together with all associated site works and services. Gross floor space of proposed works is 1907 sqm.

Rindifin ,

68m
2361138CONDITIONAL21 Sept 2023

for the construction of a housing development comprising 16no. units at Rindifin, Ennis Road (R458), Gort, Co. Galway. The development will consist of (1) 4no. type A units – 3 bed terrace (2 storey), (2) 6no. type B units – 3 bed semi-detached (2 storey), (3) 5no. type C units – 2 bed terrace units (2 storey) (4) 1no. type C unit – 1 bed apartment (single storey). The proposed development includes: (1) new proposed entrance onto the Ennis Road (R458), (2) provision for pedestrian connections to existing footpath along the Ennis Road (R458), (3) connection to public mains water infrastructure, including connection to existing surface water, foul drainage networks to serve the development, (4) provision of communal open space areas, a playground, private open space, bicycle parking, footpaths, public lighting, soft & hard landscaping, revised boundary treatments together with all associated site works & services

Rindifin , Ennis Road (R458) Gort , Co. Galway

76m
2560846CONDITIONAL26 Jun 2025

for the construction of 5 additional serviced dwelling houses and minor alterations to the site layout to accommodate the works including modified boundary treatment, previously granted under 23/61138. Gross floor space of proposed works: 513.80 sqm

Rindifin , Gort , Co Galway

86m
18569CONDITIONAL3 May 2018

for the construction of 4 serviced dwelling houses & associated site works. Gross floor space of proposed works 805.6 sqm.

Rindifin ,

120m
2561146REFUSED19 Aug 2025

to (1) Construct 3 no. warehouse/storage units with access onto the R458 through permitted entrance and access road and development approved under Pl. Ref. No. 2361429. (2) Provision for pedestrian access through permitted development onto the Ennis Road (R458). (3) Connection to public mains water infrastructure, including connection to existing foul drainage network to serve the development and (4) provision of bicycle parking, footpaths, public lighting, on site surface water drainage, revised boundary treatments, together with all associated site works and services

Rindifin , Ennis Road Gort , Co. Galway

124m
22345CONDITIONAL15 Mar 2022

for alterations to an existing planning ref. no. 18/1426 which consist of a reduction in the number of units from 3nr to 2nr residential units, proposed alterations to the previous permitted site layout including all associated site works and site services on revised site boundaries. Gross floor space of proposed works: 128.9 sqm & 128.9 sqm

Rindifin ,

127m
181426CONDITIONAL11 Oct 2018

for demolition of an existing single storey dwelling and the construction of 3 no. serviced dwellings consisting of 2 no. semi-detached units and 1 no. detached dwellings and all associated site services and site development works. Gross floor space of proposed works: 386.7 sqm.

Rindifin ,

128m
17782CONDITIONAL1 Jun 2017

of an extension to the existing dwelling house. Gross floor space of works to be retained: 7.55sqm

Cloonnahaha ,

131m
191247CONDITIONAL8 Aug 2019

for the following. (a) New Extension building to the north and west of existing building 1 premises (b) Façade alterations to elevations (c) Alteration and relocation of existing vehicular entrances, (d) New Carpark layout. (e) Connection of new surface and foul waste to existing connections (f) Associated required mechanical and electrical plant (g) Site and building signage. (h) All associated building and site works. Gross floor space of proposed works: 1187 sqm. Gross floor space of work to be retained: 6174 sqm. Gross floor space of any demolition: 395 sqm

Rindifin ,

131m
19795N/A24 May 2019

for the following. (a) New Extension building to the north and west of existing building 1 premises (b) Facade alterations to elevations. (c) Alteration and relocation of existing vehicular entrances, (d) New carpark layout. (e) Connection of new surface and foul waste to existing connections (f) Associated required mechanical and electrical plant (g) Site and building signage. (h) All associated building and site works. Gross floor space of proposed works: 1187 sqm. Gross floor space of work to be retained: 6174 sqm. Gross floor space of any demolition: 395 sqm

Rindifin ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?