Proposed Development

BUILD A PRIVATE SELF CONTAINED SINGLE STOREY GRANNY FLAT AT REAR OF DWELLING WITH CONNECTION TO EXISTING SEPTIC TANK AND PERCOLATION AREA

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jun 2023

  2. Further information requested

    3 Aug 2023

  3. Application withdrawn

    14 Feb 2024

Application Details

Location
ALDERWOOD ROAD , TRALEE , CO KERRY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.2 ha

Timeline

Registration Date
14 June 2023
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
14 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

139m
19573CONDITIONAL30 May 2019

(A) CHANGE THE USE OF A FUEL DISTRIBUTION YARD AND COVERED STORAGE UNIT, (B) PART DEMOLISH THE EXISTING LEAN TO STRUCTURE, TO CONSTRUCT A WAREHOUSE TYPE STRUCTURE AT APPROXIMATELY 780 SQM TO ACCOMMODATE TRALEE GYMNASTICS CLUB LTD AND (C) CONSTRUCT 600 SQM OF WHOLESALE WAREHOUSING WITH ALL ASSOCIATED SITE WORKS AND ON SITE PARKING

DROMTHACKER , TRALEE , CO KERRY

141m
2460598REFUSED22 Aug 2024

Planning Permission to a) Construct a plastered block road boundary wall, with associated gated splayed entrance b) construct all associated site works at Dromtaker, Tralee, Co Kerry V92Y74C

Dromtaker , Tralee , Co.Kerry

257m
18665CONDITIONAL3 Jul 2018

RETAIN AN EXISTING SINGLE STOREY DWELLING HOUSE SERVED BY A GARAGE AND GLASS HOUSE ALL AS CONSTRUCTED

ALDERWOOD ROAD , DROMTHACKER , TRALEE

279m
21525CONDITIONAL19 May 2021

CHANGE THE FRONT ELEVATION OF THE EXISTING DWELLING BY REPLACING EXISTING GARAGE DOOR WITH WINDOW

DROMTHACKER , TRALEE , CO KERRY

302m
2660694N/A22 Jul 2026

The construction of a two-storey building comprising of a fallow area on ground floor for future staff welfare facilities and staff canteen and kitchen at first floor level within the existing site campus, ancillary outbuildings, adjustments to positioning and layout of the approved car park to facilitate the proposed building, with no change in total number of permitted spaces, external ground mounted plant and equipment, new signage on the southern elevation together with all associated site development works including realignment of the approved site drainage, adjustments to site levels and adjustments to the approved landscape plan.

Dromthacker and Knockawaddra West , Tralee , Co. Kerry

333m
2460694CONDITIONAL16 Sept 2024

PERMISSION for amendments and alterations to the approved pharmaceutical ‘Fill-Finish’ production facility permitted under planning register 23/60295 (10-year duration of permission), i. Construction of a dual fire water retention / attenuation pond (c. 4,500m3), and an additional smaller surface water attenuation (150m3) pond with a combined site area of approximately 2,250m2 to include a 1.2m high perimeter fence. ii. Adjustments to positioning and layout of the approved car park to facilitate the proposed pond, with no change in total number of permitted spaces. iii. Adjustments to the approved internal road layout to include set-down area and turning circle. iv. Permanent permission for the existing 2.4m high temporary construction security fence in place of approved fencing at the northern boundary of the site. v. Associated works include re-alignment of the approved site drainage, adjustments to site levels and adjustments to the approved landscape plan.

Kerry Technology Park , Dromthacker , Tralee

393m
2460288CONDITIONAL9 May 2024

THE PROPOSED DEVELOPMENT WILL CONSIST OF (i) THE PARTIAL CHANGE OF USE OF EXISTING BUILDING AT GROUND FLOOR LEVEL FROM PRODUCTION TO OFFICE AND CANTEEN (ii) THE CONSTRUCTION OF A SUSPENDED FLOOR AT FIRST FLOOR LEVEL WITHIN HIGH BAY SECTION OF EXISTING BUILDING FOR OFFICE AND PLANTROOM USE, (iii) EXTERNAL GROUND & ROOF MOUNTED PLANT AND EQUIPMENT (iv) SIGNAGE (v) PROVISION OF PERIMETER FENCING TOGETHER WITH ALL ASSOCIATED SITE WORKS.

Kerry Technology Park Dromthacker & Knockawaddra West , Tralee , Co. Kerry

429m
2360295CONDITIONAL8 Nov 2023

See site notice for full description. Below is a brief description set to the character limit of the Planning Portal. Astellas Ireland Co., Ltd., intend to apply for permission for development of a pharmaceutical ‘Fill-Finish’ production facility over two construction phases. The application seeks a 10 year duration of planning permission. The proposed development will include: (i) a 3 storey pharmaceutical ‘Fill-Finish’ Production Building with an overall total building floor area of 19,989 sqm and maximum height to roof parapet of approximately 24.63m constructed over 2 no. phases. (ii) a Central Utilities Building (CUB) with floor area of 663 sqm and maximum height to roof parapet of approximately 10.135m to include vent outlets. (iii) A Woodchip Boiler Building constructed in Phase 1, with a floor area of 359 sqm and maximum height to roof parapet of 9.26m to include 2 no. flues. (iv) Electrical Switch Room and ESB Sub-Station Building constructed in Phase 1, with a floor area of 37 sqm and maximum height to roof parapet of approximately 2.965m; (v) a Security Office Building constructed in Phase 1, with floor area of 63 sqm and maximum height to roof parapet of approximately 4.965m; (vi) a Sprinkler Pump House constructed in Phase 1, with floor area of 40 sqm and maximum height to parapet of approximately 4.21m with associated Sprinkler Water Tank; (vii) a Waste Water Pre-Treatment Plant, with 1 no. associated storage tank constructed in Phase 1 and a second associated storage tank constructed in Phase 2; (viii) Utilities and Services Yard (ix) Site infrastructure works (x) Site boundary fencing and site landscaping; (xi) A temporary contractor’s compound and parking area for the duration of the construction works. The applicant also intends to submit a concurrent planning application to alter electrical cable infrastructure on adjoining and overlapping lands. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Kerry Technology Park , Dromthacker , Tralee

437m
267CONDITIONAL19 Jan 2026

REDSIII for a c.125 kWp renewable energy solar PV installation consisting of up to c.575m2 (213No.) Roof Mounted solar panels and all associated works

MTU North Campus , Dromtacker , Tralee

466m
211513CONDITIONAL22 Dec 2021

(A) CONSTRUCT A DETACHED SINGLE STOREY STORAGE UNIT (B) TO INSTALL 3 NO. WINDOWS TO EXISTING CONFERENCE ROOM ON EAST ELEVATION OF EXISTING SCHOOL BUILDING AND ALL ASSOCIATED SITE WORKS (C) TO CONSTRUCT REAR GROUND FLOOR EXTENSION TO EXISTING CAFÉ OF EXISTING SCHOOL BUILDING AND ALL ASSOCIATED SITE WORKS

DROMTHACKER , TRALEE , CO KERRY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?