2374

CONDITIONAL

Offaly - Offaly County Council

Proposed Development

10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST PARCEL (DOVEHILL TOWNLAND) C.81.04 HECTARES, CENTRAL PARCEL (GORTNAMUCK & CURRAGHMORE (EGLISH BY) TOWNLANDS) C.42.2 HECTARES AND EAST PARCEL (GORTNAMUCK & FREAGH TOWNLANDS) C.16.07 HECTARES; A ROUTE CORRIDOR OF 3 HECTARES FOR AN UNDERGROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C.3,956M UNDERGROUND CABLING WITHIN THE CORRIDOR OF THE L6042 'RATH ROAD' PUBLIC ROAD. THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C.142.31 HECTARES AND CONSISTS OF THE FOLLOWING; 834,632 SQ. METRES OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES; INVERTER/TRANSFORMER STATIONS; UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS; BOUNDARY SECURITY FENCING; 2 NO. MEDIUM VOLTAGE (MV) CONTROL BUILDINGS; NEW INTERNAL ACCESS TRACKS ASSOCIATED DRAINAGE INFRASTRUCTURE; 3 NO. SITE ENTRANCES TO THE L6042 'RATH ROAD' PUBLIC ROAD; 40 NO. CCTV/ LIGHTING POSTS AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 2,750 METRES IN LENGTH ALONG THE L6042 'RATH ROAD' PUBLIC ROAD AND APPROXIMATELY 1,206 METRES WITHIN THE SOLAR FARM LANDS. THE PROPOSED SOLAR FARM WILL BE BROKEN INTO 2 NO. SEPARATE PHASES. 'PHASE 1' WILL CONSIST OF THE DEVELOPMENT OF THE SOLAR PV ARRAYS LOCATED IN THE EAST PARCEL (C.16.07 HA), CENTRAL PARCEL (C.42.2 HA) AND THE WEST PARCEL (C.14.46 HA). 'PHASE 2' OF THE SOLAR FARM WILL CONSIST OF THE DEVELOPMENT OF THE REMAINDER OF THE SOLAR PV ARRAYS IN THE WEST PARCEL COVERING A SITE AREA OF C.66.58 HA. AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 110KV ELECTRICAL SUBSTATION WITH ELECTRICAL CONTROL BUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WHICH IS TO BE LOCATED IN THE EAST PARCEL, WILL BE LODGED WITH AN BORD PLEANÁLA IN DUE COURSE

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Feb 2023

  2. Further information requested

    19 Apr 2023

  3. Further information received

    12 Jun 2023

  4. Decision due

    20 Sept 2023

  5. Decision: CONDITIONAL

    20 Sept 2023

  6. Grant issued

    25 Oct 2023

Application Details

Location
THE TOWNLANDS OF DOVEHILL GORTNAMUCK CURRAGHMORE (EGLISH BY) , AND FREAGH , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
142.3 ha

Timeline

Registration Date
24 February 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 September 2023
Grant Date
25 October 2023
Permission Expires
24 October 2033

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

308m
22586N/A11 Nov 2022

A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST PARCEL (DOVEHILL TOWNLAND) C. 119.25 HECTARES, CENTRAL PARCEL (GORTAMUCK & CURRAGHMORE (EGLISH BY) TOWNLANDS) C. 42.2 HECTARES AND EAST PARCEL (GORTAMUCK & FREAGH TOWNLANDS) C. 16.07 HECTARES; A ROUTE CORRIDOR OF 3.5 HECTARES FOR AN UNDERGROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C. 3,859M UNDERGROUND CABLING WITHIN THE CORRIDOR OF THE L6042 'RATH ROAD' PUBLIC ROAD. THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C. 181.02 HECTARES AND CONSISTS OF THE FOLLOWING;1,070,756 SQ. METRES OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES; INVERTER / TRANSFORMER STATIONS; UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS; BOUNDARY SECURITY FENCING; 2 NO. MEDIUM VOLTAGE (MV) CONTROL BUILDINGS; NEW INTERNAL ACCESS TRACKS ASSOCIATED DRAINAGE INFRASTRUCTURE; SITE ENTRANCES TO THE L6042 'RATH ROAD' PUBLIC ROAD; 54 NO. CCTV/ LIGHTING POSTS AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 3,859 METRES IN LENGTH ALONG THE L6042 'RATH ROAD' PUBLIC ROAD AND APPROXIMATELY 661.5 METRES WITHIN THE SOLAR FARM LANDS. THE PROPOSED SOLAR FARM WILL BE BROKEN INTO 2 NO. SEPARATE PHASES. 'PHASE 1' WILL CONSIST OF THE DEVELOPMENT OF THE SOLAR PV ARRAYS LOCATED IN THE EAST PARCEL (C. 16.07 HA), CENTRAL PARCEL (C. 42.2 HA) AND THE WEST PARCEL (C. 52.67 HA). 'PHASE 2' OF THE SOLAR FARM WILL CONSIST OF THE DEVELOPMENT OF THE REMAINDER OF THE SOLAR PV ARRAYS IN THE WEST PARCEL COVERING A SITE AREA OFC. 66.58 HA. AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 1 10KV ELECTRICAL SUBSTATION WITH ELECTRICAL CONTROL BUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WHICH IS TO BE LOCATED IN THE EAST PARCEL, WILL BE LODGED WITH AN BORD PLEANÁLA IN DUE COURSE

THE TOWNLANDS OF DOVEHILL GORTAMUCK CURRAGHMORE (EGLISH BY) AND , FREAGH , CO. OFFALY

470m
22622N/A5 Dec 2022

A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST PARCEL (DOVEHILL TOWNLAND) C. 119.25 HECTARES, CENTRAL PARCEL (GORTNAMUCK & CURRAGHMORE (EGLISH BY) TOWNLANDS) C. 42.2 HECTARES AND EAST PARCEL (GORTNAMUCK & FREAGH TOWNLANDS) C. 16.07 HECTARES; A ROUTE CORRIDOR OF 3.5 HECTARES FOR AN UNDERGROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C. 3,859M UNDERGROUND CABLING WITHIN THE CORRIDOR OF THE L6042 'RATH ROAD' PUBLIC ROAD. THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C. 181.02 HECTARES AND CONSISTS OF THE FOLLOWING;1,070,756 SQ. METRES OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES; INVERTER / TRANSFORMER STATIONS; UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS; BOUNDARY SECURITY FENCING; 2 NO. MEDIUM VOLTAGE (MV) CONTROL BUILDINGS; NEW INTERNAL ACCESS TRACKS ASSOCIATED DRAINAGE INFRASTRUCTURE; SITE ENTRANCES TO THE L6042 'RATH ROAD' PUBLIC ROAD; 54 NO. CCTV/ LIGHTING POSTS AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 3,859 METRES IN LENGTH ALONG THE L6042 'RATH ROAD' PUBLIC ROAD AND APPROXIMATELY 661.5 METRES WITHIN THE SOLAR FARM LANDS. THE PROPOSED SOLAR FARM WILL BE BROKEN INTO 2 NO. SEPARATE PHASES. 'PHASE 1' WILL CONSIST OF THE DEVELOPMENT OF THE SOLAR PV ARRAYS LOCATED IN THE EAST PARCEL (C. 16.07 HA), CENTRAL PARCEL (C. 42.2 HA) AND THE WEST PARCEL (C. 52.67 HA). 'PHASE 2' OF THE SOLAR FARM WILL CONSIST OF THE DEVELOPMENT OF THE REMAINDER OF THE SOLAR PV ARRAYS IN THE WEST PARCEL COVERING A SITE AREA OF C. 66.58 HA. AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 110KV ELECTRICAL SUBSTATION WITH ELECTRICAL CONTROL BUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WHICH IS TO BE LOCATED IN THE EAST PARCEL, WILL BE LODGED WITH AN BORD PLEANÁLA IN DUE COURSE

THE TOWNLANDS OF DOVEHILL GORTNAMUCK , CURRAGHMORE (EGLISH BY) AND FREAGH , CO. OFFALY

754m
23179CONDITIONAL26 Apr 2023

CONSTRUCTION OF A CATTLE SHED WITH UNDERGROUND SLATTED SLURRY STORAGE, CATTLE HANDLING AREA AND ASSOCIATED SITE WORKS

CURRAGHMORE , KILCORMAC , CO. OFFALY

894m
2658N/A18 Jun 2026

BUILDING A NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ANCILLARY SITE WORKS

CORNAGARK , KILCORMAC , CO.OFFALY

1.2km
2660060CONDITIONAL9 Feb 2026

the realignment of the access route to the central land parcel of the solar farm development from Rath Road, granted permission under parent permission (Reg. Ref. 23/74), along with the erection of a new post and rail fence and associated site works.

Harvest Lodge Rath Road , Townland of Gortnamuck , Kilcormac County Offaly

1.2km
2660026N/A20 Jan 2026

the realignment of the access route to the central land parcel of the solar farm development from Rath Road, granted permission under parent permission (Reg. Ref. 23/74), along with the erection of a new post and rail fence and associated site works

Harvest Lodge Rath Road , Townland of Gortnamuck , Kilcormac County Offaly

1.2km
2660050N/A3 Feb 2026

the realignment of the access route to the central land parcel of the solar farm development from Rath Road, granted permission under parent permission (Reg. Ref. 23/74), along with the erection of a new post and rail fence and associated site works

Harvest Lodge Rath Road , Townland of Gortnamuck , Kilcormac County Offaly

1.2km
2560610N/A2 Dec 2025

the realignment of the access route to the central land parcel of the solar farm development from Rath Road, granted permission under parent permission (Reg. Ref. 21/74). Permission is also sought to relocate a telecoms pole and erect a post and rail fence and associated site works.

Harvest Lodge Rath Road , Townland of Gortnamuck , Kilcormac County Offaly

1.7km
1878CONDITIONAL22 Feb 2018

A NEW DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED WORKS

GORTNAMUCK , KILCORMAC , CO. OFFALY

1.9km
2560459N/A1 Oct 2025

The development will consist of : planning permission to amend the development previously approved under planning Ref: 23/60196 by a) omitting 4 previously approved No. Lean-to Type Houses (Previous Ref: E 1-4), and replacing with 3 No. Portal Frame type houses (Ref: E1-3), and, b) providing for an alteration to the previously approved stock numbers on the pig farm, resulting in an increase in breeding stock and a reduction in production pigs,

Roundhill and Derry Upper , Kilcormac , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?