The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

23784

CONDITIONAL

Meath - Meath County Council

Proposed Development

retention permission for existing sunroom to side of existing dwelling with internal modifications and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Aug 2023

  2. Decision: CONDITIONAL

    28 Sept 2023

  3. Decision due

    2 Oct 2023

  4. Grant issued

    9 Nov 2023

Application Details

Location
Dean Hill , Hayes , Navan Co. Meath C15 KW6V
Applicant
N/A
Application Type
RETENTION
Planning Authority
Meath County Council
Site Area
272 ha

Timeline

Registration Date
8 August 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 September 2023
Grant Date
9 November 2023
Permission Expires
8 November 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
23716N/A17 Jul 2023

retention permission for existing sunroom to side of existing dwelling with internal modifications and associated site works

Dean Hill , Hayes , Navan Co. Meath C15 KW6V

104m
AA170041N/A20 Jan 2017

the development consists of the construction of a replacement dwelling in lieu of a detached house which is to be demolished. Including connection to existing wastewater treatment plant and all associated services and site development works

Kingstown Great & Carnuff Little , Haystown , Navan Co. Meath

119m
AA170100CONDITIONAL3 Feb 2017

the development consists of the construction of a replacement dwelling in lieu of a detached house which is to be demolished. Including connection to existing wastewater treatment plant and all associated services and site development works

Kingstown & Carnuff Great & Haystown & Carnuff Little , Haystown , Navan Co. Meath

132m
2660085CONDITIONAL23 Jan 2026

the development will consist of construction of a two storey style dwelling with detached domestic garage, install a proprietary sewage treatment system and form new entrance from public road

Kingstown And Carnuff Great , Navan , Co. Meath

199m
24325N/A1 Aug 2024

retention of revised site boundary and revised location of waste water treatment system at Kingstown & Carnuff Great, Navan, Co Meath. The revised site boundary and waste treatment system is as constructed on site and is a revision to that previously granted under planning reference (AA190559)

Kingstown & Carnuff Great , Navan , Co Meath

199m
24348CONDITIONAL23 Aug 2024

retention of revised site boundary and revised location of waste water treatment system. The revised site boundary and waste treatment system is as constructed on site and is a revision to that previously granted under planning reference (AA190559)

Kingstown & Carnuff Great , Navan , Co Meath

213m
AA190559CONDITIONAL7 May 2019

the construction of a 2 storey dwelling house with detached domestic garage, new vehicular access onto the public road, new waste water treatment system and all associated site works. Significant Further information/Revised plans submitted on this application.

Kingstown and Carnuff Great , Navan , Co. Meath

220m
2660219N/A26 Feb 2026

the development will consist of a change of use from agricultural land to a stoned yard area, to be used as an overflow truck and car parking area, together with all associated site development works and new boundary fencing

Dean Hill Hays , Navan , Co Meath

220m
2660180N/A17 Feb 2026

the development will consist of a change of use from agricultural land to a stoned yard area, to be used as an overflow truck and car parking area, together with all associated site development works

Dean Hill Hays , Navan , Co. Meath

270m
AA200858REFUSED3 Jul 2020

construction of a two storey style dwelling with detached domestic garage, install a proprietary sewage treatment system and form new entrance to public road with associated site works

Kingstown & Carnuff Great , Navan , Co. Meath

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?