238013
N/ALimerick - Limerick County Council
Proposed Development
The development works that will consist of: (1) Construction of dedicated cycle track facilities on both sides of the R526 St. Nessans Road over an approximate length of 600m between the St. Nessans Park entrance road (south of St. Pauls Roundabout) and the Crescent Shopping Centre entrance road (north of Ballykeeffe Roundabout) to encompass St. Pauls Roundabout and Ballykeeffe Roundabout and alterations to existing road carriageway widths; (2) Provision of a shared street arrangement through Ballykeeffe Estate to facilitate cyclist access to/from Ballykeeffe Roundabout; (3) Re-construction of pedestrian footpaths on both sides of the R526 where required to facilitate the upgrade works; (4) Upgrade of the existing zebra crossings on the R526 adjacent St. Pauls Roundabout to signalised pedestrian/cyclist crossings, upgrade of the existing crossing on the L-1429 Father Russell Road and provision of a new crossing on the Scoil Phoil Naofa access road; (5) Provision of bus priority signals on the northbound and southbound approaches to St. Pauls Roundabout on the R526 in conjunction with the crossing upgrades; (6) Re-construction of a section of the boundary wall to St. Pauls Nursing Home; (7) Closure of an existing entrance off St. Pauls Roundabout to St. Pauls Nursing Home; (8) Reconstruction of a section of the low boundary wall to protected structure No. 1648 St. Pauls Church Dooradoyle; (9) Alterations to the Ballykeeffe Estate junction with the R526; (10) Upgrade of the existing zebra crossings on the R526 and the zebra crossings on the R926 adjoining Ballykeeffe Roundabout to signalised crossings; (11) Provision of bus priority signals on the southbound approach to Ballykeeffe Roundabout on the R526 in conjunction with the crossing upgrade; (12) Provision of a stepped pedestrian access route from Ballykeeffe Estate and road crossing on the western arm of the Ballykeeffe Roundabout on the R526; (13) Re-construction of existing bus stop facilities including for the provision of island bus stop arrangements at four separate locations; (14) Improvements to drainage, water and utility services where required; (15) Road re-surfacing, road markings and coloured surfacing to cycle facilities where required; (16) Existing trees to be removed / cut back as required for the construction of the footway and cycle facilities. New trees and landscaping to be provided to compensate for removal of trees; (17) All associated site works. The development is to be carried o
View the full application file on the council's planning portal →Application Timeline
Application received
27 Sept 2023
Decision due
21 Nov 2023
Application Details
- Location
- R526 St. Nessans Road commencing to the south of St. Paul's Roundabout , and extending to the north of Ballykeeffe Roundabout , Dooradoyle
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 27 September 2023
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 21 November 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
demolition of existing walls to side of dwelling and to construct a single storey granny flat extension to side and rear of dwelling
23 Ballykeefe Estate , Dooradoyle , Limerick
demolition of existing walls to side of dwelling and to construct a single storey granny flat extension to side and rear of dwelling
23 Ballykeefe Estate , Dooradoyle , Limerick
demolition of existing walls to side of dwelling and to construct a single storey extension to side and rear of dwelling
23 Ballykeefe Estate , Dooradoyle , Limerick
demolition of existing walls to side of dwelling and to construct a single storey extension to side and rear of dwelling
23 Ballykeefe Estate , Dooradoyle , Limerick
the (a) demolition of an existing 2 storey retail building & road boundary walls and (b) construction of a 5 Storey Mixed Use Development in one block with part ground floor commercial consisting of 1 No. Retail unit and the upper floors to consist of a Build to Rent (BTR) Residential development with a total of 25 no. apartments (4 x No. Studio apartments, 10 x No. One Bedroom apartments and 11 x No. Two Bedroom apartments) All apartments provided with private balconies. Residential amenities within the BTR development to include communal spaces on upper floors. The proposal will also incorporate on the ground floor a secure internal bicycle parking area, an ESB sub-station, ancillary utility/services rooms, secure bin storage area, public lighting, car parking, connections to utilities and all associated engineering and site works necessary to facilitate the proposed development
Shannonside Kitchens Site , St Nessans Road , Dooradoyle
erection of a detached roof over an external paved area measuring 6 x 3 metres along part of the frontage of the Mens Shed building
Rear of the Council Yard , St. Nessan's Road , Dooradoyle Limerick
modifications to elevations of proposed modular unit and an extension of time relating to condition No. 2 of previously granted planning permission 16/128
Council Yard , St. Nessan's Road , Dooradoyle Limerick
the erection of an open roofed area measuring 4.8m x 3.3m for sheltered storage and hobby projects, on the western side of the Men's Shed building, within their site at rear of the Council Yard
St. Nessan Road , Dooradoyle , Limerick
7 no. residential apartments consisting of 4 no. 2 bedroom apartments and 3 no. one bedroom apartments, roof terrace amenity area, bin storage, disabled car parking space, bicycle racks, connection to main drainage and associated works
St. Nessan's Road , Dooradoyle , Limerick
7 no. residential apartments consisting of 4 no. 2 bedroom apartments and 3 no. one bedroom apartments, roof terrace amenity area, bin storage, disabled car parking space, bicycle racks, connection to main drainage and associated works. Original Planning Ref. No. 20/1058
St. Nessan's Road , Dooradoyle , Limerick
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?