24/5448

INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

Permission to construct a new dwelling house with entrance and all associated site and ancillary works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2024

  2. Decision due

    23 Sept 2024

Application Details

Location
Meadow Grove Summer Hill Carhookeal Mallow, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
29 July 2024
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
23 September 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24/5621Refused29 Aug 2024

Permission to construct a new dwelling house with entrance and all associated site and ancillary works

Meadow Grove Summer Hill Carhookeal Mallow, Co.Cork.

0m
26/1204Refused7 May 2026

planning permission to construct a new dwelling house with entrance and all associated site and ancillary works.

Meadow Grove, Summer Hill, Carhookeal, Mallow, Co. Cork.

2m
08/55086NEW APPLICATION22 Dec 2008

Permission to construct a dwellinghouse

NO. 21 Meadowgrove Mallow Co. Cork.

22m
07/55032NEW APPLICATION8 May 2007

Permission for retention for a front porch on dwelling and for a first floor extension onto dwelling. Permission for retention for a domestic garage to rear of dwelling. Full planning permission for a ground floor extension onto the eastern side of the dwelling and to install two no first floor windows to western gable of the dwelling.

22 Meadow Grove Summerhill Mallow Co Cork

24m
20/6513CONDITIONAL13 Nov 2020

The construction of a single-storey extension to the rear of dwelling house, the alteration of rear elevation and the change of roof covering of the existing dwelling house from tiles to slate.

No 20 Meadow Grove Summerhill Carhookeal Mallow, Co. Cork

70m
10/55005CONDITIONAL25 Jan 2010

Permission for construction of an extension to the front of existing dwelling

No. 18 Meadow Grove, Summerhill, Mallow Co. Cork.

81m
14/6805INCOMPLETED APPLICATION23 Dec 2014

Re-locate an existing pre-fabricated classroom (Planning Reg. No. P.D. 55014/13) and erection of 1 new additional pre-fabricated classroom and all associated site works

Gaelscoil Thomais Daibhis Carhookeal Mallow

84m
14/55004CONDITIONAL5 Mar 2014

Permission to construct a single storey stand alone building consisting of seven classrooms, toilet facilities, boiler house and ancillary development, demolition of existing stand alone external storage building, removal of existing concrete ramp and steps, removal of existing pedestrian and vehicular entrances, construction of staff car park and a new hard play space and all associated site works, landscaping to the front of the school to replace the existing parking and setdown area and all siteworks to facilitate new entrance area

Carhookeal Mallow Co. Cork.

86m
06/55056CONDITIONAL18 Jul 2006

retention for a ground floor extension onto side of dwelling and permission for construction of ground floor and first floor extension onto side of dwelling

8 White Oaks Mallow Co. Cork.

94m
15/4110CONDITIONAL23 Jan 2015

Permission to re-locate an existing pre-fabricated classroom (Planning Ref: P.D. 55014/13) and for the erection of 1 new additional prefabricated classroom, 2 no. additional car parking spaces and all associated site works

Gaelscoil Thomais Daibhis Carhookeal Mallow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.