24/5538
INCOMPLETED APPLICATIONCork - Cork County Council
Proposed Development
Permission to demolish existing single storey dwelling house and to erect a new replacement single storey dwelling house and to upgrade existing on-site waste water treatment system, bored well and all associated site works.
View the full application file on the council's planning portal →Application Timeline
Application received
14 Aug 2024
Decision due
8 Oct 2024
Application Details
- Location
- Ballard Araglin Kilworth Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 14 August 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 8 October 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to demolish existing single storey dwelling house including outhouse/shed and to erect a new replacement single storey dwelling house and to upgrade existing on-site wastewater treatment system, bored well and all associated site works
Ballard Araglin Kilworth Co.Cork
Change of location & house type from that approved under planning ref.no. 04/4364
Ballard Araglen Kilworth
Dwellinghouse and garage (change of site boundaries, layout, house and garage type from that permitted under Pl. Reg. No. 04/4364)
Ballard Araglen Kilworth
3 bedroom split level bungalow.
Ballard Araglen Kilworth Co. Cork
A single storey split level dwelling house, wastewater treatment system, entrance and retention and completion of existing garage and all associated site works.
Ballard Araglen Co. Cork
Dwelling and garage
Ballard Araglin
Construction of a single storey dwellinghouse, septic tank and percolation area, entrance and associated site works.
Ballard Kilworth Co. Cork
A single storey split level dwelling house wastewater treatment system, entrance and retention, completion of existing garage and all associated works.
Ballard Araglen Co Cork
A single storey spilt level dwelling house, and retention and completion of existing garage and wastewater treatment system and all associated works.
Ballard Araglen Co. Cork
combined waste and power facility with new entrance to public road, main tank farm (total of 20 tanks) including digester, storage, prestorage and anaerobic biofilter tanks with pumps and heat exchangers (24.29m high), 2 no. gas flares 37.3m high and 2 no. gas cleaning vessels 22m high; garage; admin. building comprising canteen, laboratory and two storey office area; storage hall; powerhouse; reception building to include truck wash, boiler room, workshop, reception areas, two underground storage tanks and gas treatment and metering area; gas engine stack 30.3m high; processing building to include band dryer, separation, evaporation, condensate, pellitizer, reactor areas, reception tanks and gas flares 37.3 high; tank farm of 8 storage, test digester and recycling tanks. Ancillary facilities will include 2 no. fire ponds, 2 no. weighbridges, pipe racks, 6 no. cooling towers 9.97m high, wells,security gates and fencing, roads,retaining walls, ramp and embankment
Ballard Araglin Fermoy
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?