24/6305
CONDITIONALCork - Cork County Council
Proposed Development
Permission to erect a longhouse modular building for use as a home office, comprising two rooms and toilet, plus ancillary site works.
View the full application file on the council's planning portal →Application Timeline
Application received
4 Dec 2024
Decision: CONDITIONAL
4 Feb 2025
Decision due
6 Feb 2025
Grant issued
11 Mar 2025
Application Details
- Location
- "The Burrows" Greenfield Ballincollig Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 4 December 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 February 2025
- Grant Date
- 11 March 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of a new single and two storey dwellinghouse, new vehicular entrance, septic tank and percolation area, new agricultural entrance and all associated site works.
Greenfield Ballincollig Co. Cork
Construction of a new single and two storey dwellinghouse, new vehicular entrance, septic tank and percolation area, new agricultural entrance, and all associated site works
Greenfield Ballincollig Co. Cork
Construct dwellinghouse including garage and associated site works
Greenfield Ballincollig Co. Cork
Two storey dwellinghouse with septic tank, percolation area and site works
Grenfield Ballincollig
Extension to dwelling & re-roofing of the existing dwelling
Lisheens Ovens
The construction of extension to dwelling and associated site works.
Lisheens Ovens Co. Cork
The construction of the following: 1. Agricultural building for the storage of straw, agricultural machinery and ancillary dry goods 2. Agricultural building for straw bedded livestock housing and associated livestock crush facilities 3. Unroofed slatted slurry tank and unroofed manure store along with associated site works.
Kilnaglory Ovens Co. Cork
Erection of 25 m. high, free standing monopole communications structure, carrying antennae and communication dishes with associated ground mounted equipment cabins to share with other licensed operators within a 2.4 m. high palisade compound at ESB Ballincollig 38kV substation
Greenfield Ballincollig
Permission for the continued use of an existing 25 metre high free standing monopole communications structure carrying antennae and communication dishes to share with other licensed operators within an existing 2.4m high palisade compound
ESB Ballincollig 38kV Substation Greenfield Ballincollig Co.Cork
Intend to apply for 10 year planning permission. Underground electricity grid connection cabling, substation and ancillary site works. The development will comprise (1) a grid connection consisting of medium voltage cables and ducting in a excavated trench with a total length of c.1194 meters which will be installed on private land and public roads (L-2216 & L-22161); (2) control/switching substation consisting of either (i) single storey block building or (ii) 2 no. modular units; (3) cable beam over grange hill stream; (4) provision of ring main unit (RMU); (5) and all associated site development and reinstatement works. The proposed development includes minor revisions to the approved layout of the solar farm previously permitted under Cork County Council planning reference 18/5760 comprising omission of substation and satellite mast, and provision of the above referenced RMU, and the addition of a cable beam and underground cabling. The purpose of the proposed development is to connect the permitted solar farm under reference 18/5760 to the national grid at the existing Ballincollig 38Kv substation.
Kilnaglory Lisheens Greenfield Co.Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?