24273
CONDITIONALClare - Clare County Council
Proposed Development
of the following as part variation of previously granted permission P08/1258: to retain A) revised entrance location, B) revised percolation area location, C) change of use of domestic garage to home office, D) domestic garage, E) first floor accommodation area to existing dwelling, F)increased ridge height and minor elevational changes to existing dwelling plus all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Aug 2024
Decision: CONDITIONAL
21 Oct 2024
Decision due
24 Oct 2024
Grant issued
26 Nov 2024
Application Details
- Location
- Coolderry , Ardnacrusha , Co Clare V94 RR6P
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 30 August 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 October 2024
- Grant Date
- 26 November 2024
- Permission Expires
- 25 November 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the construction of an entrance, dwelling house, domestic wastewater treatment system with polishing filter all associated site works
Coolderry , Ardnacrusha , Co Clare
to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, widen existing agricultural entrance, including all ancillary site works
Coolderry Td , Ardnacrusha , Co Clare
of the detached garage on site, the altered fenestration to the dwelling house, the existing entrance as built and all associated and ancillary site works
Blackwater , Ardnacrusha , Co. Clare V94 H04V
for a 10 year planning permission for a solar array at Ballyglass, Coolderry, Dromintobin North, Reanabrone, and Oakfield (townlands) Ardnacrusha, Co Clare. The development will consist of c265,000 m2 of solar panels on ground mounted frames, 8 no. single storey control cabins with associated electrical transformer units and hardstand areas, 2 no. ring main units, underground cabling within the solar array site and within the L70382 public road to connect solar array field parcels, security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to four existing agricultural field entrances on the R463, l3046 and L70382 and creation of new entrance on L70382, temporary construction compound, landscaping and all associated ancillary apparatus and development works. The solar array will connect to the national grid and will have an operational lifespan of 35 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
Ballyglass Coolderry Dromintobin North Reanabrone , and Oakfield (townlands) Ardnacrusha , Co Clare
to construct a Feeding Passage with Slatted Tank, Holding yard with slatted tank, effluent tank and ancillary works.
Coolderry , Ardnacrusha , Co Clare
for the construction of a dwelling house, garage, wastewater treatment system, new entrance and all associated works
Oakfield , Co. Clare
of an existing detached garage and all ancillary site works
Roo East , Ardnacrusha , Co. Clare
for detached two storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area connection to necessary services, new entrance together with all associated ancillary and incidental site works
Blackwater , Ardnacrusha , Co Clare
to construct a dwelling house, garage, wastewater treatment system with soil polishing filter together and all associated site development works and services including connection to existing well
Tooreen , Kilmore , Co Clare
to construct a dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
Roo East , Ardnacrusha , Co. Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?