24416

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

RETAIN (A) EXISTING TYRE STORAGE SHED (B) TYRE FITTING SHED (C) DOMESTIC STORAGE SHED

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Nov 2024

  2. Further information requested

    14 Jan 2025

  3. Further information received

    12 Jun 2025

  4. Decision: CONDITIONAL

    5 Aug 2025

  5. Decision due

    7 Aug 2025

  6. Grant issued

    8 Sept 2025

Application Details

Location
PARK PARK ROAD , KILLARNEY , CO KERRY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kerry County Council
Site Area
0.131 ha

Timeline

Registration Date
12 November 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 August 2025
Grant Date
8 September 2025
Permission Expires
7 September 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
19622CONDITIONAL14 Jun 2019

CHANGE USE OF EXISTING PREMISES FROM DWELLING HOUSE TO OFFICE UNIT

PARK ROAD , KILLARNEY

74m
2289CONDITIONAL1 Feb 2022

(A)DEMOLISH THE EXISTING KILLARNEY AUTOS/DALY MOTORS LTD (B) PLANNING PERMISSION TO CONTRUCT RESIDENTIAL BUILDING COMPRISING OF 43 APARTMENTS (C) PERMISSION TO CONSTRUCT NEW CAR PARKING ON THE GROUND FLOOR AND ALL ANCILLARY SERVICES AND ALL ASSOCIATED SITE WORKS

PARK , KILLARNEY , CO KERRY

90m
21961CONDITIONAL20 Aug 2021

CHANGE OF USE FROM EXISTING COMMERCIAL BANK TO A SOUTH DOC/DOCTORS SURGERY WITH EXTERNAL AND INTERNAL CHANGES AND ALL ASSOCIAGTED SITE WORKS

PARK SHOPPING VILLAGE , UPPER PARK ROAD , KILLARNEY

90m
2560585CONDITIONAL8 Jul 2025

We, Focus Housing Association CLG intend to apply for permission for development comprising amendments to the development permitted under KCC Ref. 21/205 on a site of 0.243 ha on lands at Woodlands Industrial Estate, Killarney Bypass Road, Park Townland, Killarney, Co. Kerry, V93 RX06The proposed development comprising amendments to the permitted scheme consists of reconfiguration of basement to incorporate water tanks, attenuation tank, lift pit, ESB substation, meter room and switch room; 2 no. service access doors in addition to a fire escape door to be provided from N22 Bypass Road; Reconfiguration of ground floor plan to include modifications to bicycle parking (overall increase of bicycle spaces to 136 no.), bin area, lift pits, stairways and pedestrian access; Modifications to car parking area at ground floor level (from 80 no. spaces to 74 no. spaces including 4 no. accessible spaces); Modifications to communal open space provision and landscaping (from 719 sqm to 375 sqm) due to omission of a roof terrace and alterations at first floor podium level; Reconfiguration of permitted floor plans on each level to provide for amended unit layouts with associated balconies/terraces and with amended vertical & horizontal circulation ( in each block ) . Total provision of 67 no. units remains unaltered with now proposed mix of 33 no. 1 bed and 34 no. 2 bed units. Minor modifications to the footprint of Block A and B and alterations to all elevations. The proposed changes will result in an increase of total gross floor area by c.871.5 sqm; no change to maximum height (the number of storeys has not increased) as previously permitted. Permission is also sought for temporary removal of the existing retaining wall adjacent to the N22 Bypass Road which will be subsequently rebuilt to match existing height and material finish. Permission is sought for all associated site development and infrastructural works.

Lands at Woodlands Industrial Estate , Killarney Bypass Road Park Townland , Killarney Co. Kerry

92m
21205CONDITIONAL2 Mar 2021

(A) DEMOLISH FORMER ADVANCE TYRES BUILDING (B) CONSTRUCT 5 STOREY BUILDING COMPRISING OF THE CONSTRUCTION OF 67 APARTMENTS (D) CONSTRUCT CAR PARKING ON THE GROUND FLOOR ALL ANCILLARY SERVICES AND ALL ASSOCIATED SITE WORKS

WOODLANDS INDUSTRIAL ESTATE , KILLARNEY BYPASS ROAD , TOWNLAND OF PARK

93m
1929N/A18 Jan 2019

(A) DEMOLISH FORMER ADVANCE TYRES BUILDING (B) CONSTRUCT 4 STOREY BUILDING COMPRISING OF (C) 28 APARTMENTS ON SECOND AND THIRD FLOOR. (D) CONSTRUCT CAR PARKING ON THE GROUND FLOOR. (E) CONSTRUCT 2 NO. RETAIL WAREHOUSES COMPRISING OF STORAGE AREAS, CANTEEN, TOILET FACILITIES, ANCILLARY SERVICES ON THE GROUND AND FIRST FLOOR AND ALL ASSOCIATED SITE WORKS

WOODLANDS INDUSTRIAL ESTAES , KILLARNEY BYPASS ROAD , CO.KERRY

124m
18567CONDITIONAL13 Jun 2018

EXTEND AND MAKE ELEVATIONAL CHANGES TO EXISTING DWELLING HOUSE

BEECHWOOD AVENUE , PARK ROAD , KILLARNEY

130m
191322CONDITIONAL20 Dec 2019

DEMOLISH PART OF EXISTING HOUSE, MAKE ELEVATIONAL CHANGES, CONNECT TO PUBLIC SEWER AND DECOMMISSION EXISTING SEPTIC TANK

PARK (BEECHWOOD AVENUE) , KILLARNEY , CO KERRY

133m
2360280CONDITIONAL3 Nov 2023

RETENTION PERMISSION for enclosed rear foyer area and PERMISSION for the following proposed works: (A) New build single storey standalone walkway to rear, connecting rear bedroom blocks to leisure centre and rear bar/restaurant area. (B) New build single storey lean-to enclosed walkway with first floor balcony roof to central area off green space, connecting rear bedroom blocks to central foyer. (C) New enclosed ramp in central courtyard. (D) New 2nd floor extensions to NE Hostel block and change of use of GF from hostel rooms to 10 No. 1 bed holiday apartments and First Floor to 10 No. duplex holiday short term let apartments ( over First and proposed Second floor ) comprising 5 No. 2 bed, 4 No. 3bed and 1 No. 4 bed along with elevational changes to front and rear. (E) New 2nd floor extensions to NE block and change of use of First Floor to 4 No. 2bed duplex holiday short term let apartments ( over First and proposed Second floor ) along with elevational changes to front and rear. (F) Change of use of 2 No. existing two storey hotel bedroom blocks, adjacent hotel main entrance, to the following: 8 No. hotel office/admin rooms at ground with 7 No. admin/meeting rooms at first floor & 1 No. 2bed and 3 No. 3bed duplex holiday short term let apartments over Ground & First Floors along with elevational changes to front and rear. (G) Change of use of part rear foyer & toilets to pub/restaurant area along with external terrace area and related canopies to courtyard elevation. (H) Change of use of part central reception/foyer to restaurant area. (I) General Façade and elevational changes to North, East & Southern front and courtyard/rear facades. (J) Fence enclosed hard landscaped play area and minor elevational change to Western elevation. (K) Future PV panel areas to existing flat roof eastern and southern blocks. (L) Demolition of external stairs and first floor bridge to accommodation blocks adjacent main entrance. (M) Revised set-down & parking area at hotel entrance with all overall development associated hard and soft landscaping and all associated site works at Ballycasheen (Hotel Killarney) Cork Road, Killarney, Co Kerry.

Ballycasheen (Hotel Killarney) , Cork Road , Killarney Co Kerry

133m
2514CONDITIONAL27 Jan 2025

FOR A SINGLE STOREY EXTENSION AND PART INTERNAL CHANGE OF USE, ALL FOR STORAGE, AND ALL ASSOCIATED SITE SERVICES AND WORKS

Ballycasheen , (Hotel Killarney) Cork Road , Killarney

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?