The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2443347

REFUSED

Cork - Cork City Council

Proposed Development

Permission for retention for the removal of the two interconnecting doors and the permanent building up of these two door openings in the party wall at ground and first levels respectively between Unit 5 and Unit 6 Westpoint Business Park Leo Murphy Road Ballincollig Cork. they revert to being two separate units with Unit 5 retaining its current use as office facility with ancillary support space and Unit 6 retaining its current use as a warehouse/production area with ancillary accommodation.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Oct 2024

  2. Decision: REFUSED

    18 Dec 2024

  3. Decision due

    19 Dec 2024

Application Details

Location
Unit 5 and Unit 6 , Westpoint Business Park , Leo Murphy Road
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork City Council
Site Area
0.0935 ha

Timeline

Registration Date
25 October 2024
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
18 December 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

21m
2342169REFUSED20 Jul 2023

Permission for developments at part of existing Unit 3 and part of existing Unit 2 to combined units '1, 2 & 3', Westpoint Buildings, Westpoint Business Park, Link Road, Ballincollig, Cork. Proposed developments consist of the subdivision and change of use of vacant ground floor area (430 sq.m) of part of Unit 3 and part of Unit 2, to combined units '1,2 & 3', from permitted office-based industry/ high-tech manufacturing use, to a full day care childcare facility. Proposed development to include : (1) Alterations to the internal layout of the ground floor area for which planning permission is sought: (2) The provision of a private open-space play area to the rear of the building, screened by 2m high boundary fencing and fire exit gate; (3) Minor alterations to the rear elevation to include the construction of 1 no. new fire exit door and provision of new screen canopies over the proposed open-space play area; (4) Provision of new signage on front elevation; (5) Provision of new bicycle stand; and (6) All associated ancillary site works.

Site at part of existing Unit 3 and part , of existing Unit 2 to combined units 1 2 & 3 , Westpoint Buildings Westpoint Business Park

24m
2442683REFUSED20 Feb 2024

Permission for development at Units 1, 2 and 3, Westpoint Business Park, Link Road, Ballincollig, Cork. The development will consist of: The partial change of use and amalgamation of the ground floor of units 1,2 and 3 of Westpoint Business Park from office-based industry/ high-tech manufacturing to a childcare facility. The proposed development includes internal and external alterations to amalgamate and re-configure the existing units, provision of associated outdoor play area, signage, internal road reconfiguration to provide 2 no. pedestrian crossings, pedestrian walkways, dropped kerbs, 2 no. drop-off parking spaces, car and cycle parking, and all associated works necessary to facilitate the development. The proposed development will be accessed via Leo Murphy Road/ Link Road, Ballincollig.

Units 1 2 and 3 , Westpoint Business Park , Link Road Ballincollig

82m
176704CONDITIONAL18 Oct 2017

Permission for 1) the removal of an existing canopy and the provision of a rear extension to provide for a freezer/storage area with associated plant at roof level of the existing bakery building; 2) The partial demolition of an existing shed and the relocation and extension of the existing shed (currently located to the rear of the building) to the south of the existing building. The proposed new shed is to be used for the storage of plant/equipment; 3) The provision of a canopy to the northern side of the existing building to facilitate deliveries and the provision of 4 no. silos for the storage of flour; 4) The proposed change of use of the eastern section of the existing building from retail to a bread production facility with ancillary office, canteen and staff facilities at first floor level; and 5) minor elevational changes.

O'Keeffe's Bakery , West Point Business Park , Link Road Carrigrohane

139m
1938703CONDITIONAL17 Sept 2019

Permission for two-storey extension to side, single storey extension to rear and new front door canopy on front elevation of existing dwelling house.

74 The Cloisters , Carrigrohane , Ballincollig

139m
2039336CONDITIONAL10 Jun 2020

Permission for two storey extension to side. Single storey extension to rear and new front door canopy on front elevation of existing dwelling house at 74 The Cloisters Carrigrohane Ballincollig Cork.

74 The Cloisters , Carrigrohane , Ballincollig

142m
2241039CONDITIONAL20 Apr 2022

Permission for development at Unit 2, Block A, Westpoint Business Park, Link Road, Ballincollig, Cork. The development will consist of the change of use of the existing first floor space (191.90 sq.m) from storage use to veterinary use associated with the operation of a small animals veterinary clinic and all ancillary works.

Unit 2 Block A , Westpoint Business Park , Link Road Ballincollig

167m
176696N/A18 Oct 2017

Retention of change of use of first floor of light industrial/trade/warehouse/service/distribution unit to women’s gym and ancillary areas.

Unit 11A and 12A Westpoint Trade Centre , Carrigrohane , Ballincollig

167m
176816CONDITIONAL31 Oct 2017

Retention of change of use of first floor of light industrial/trade/warehouse/service/distribution unit to women’s gym and ancillary areas.

Unit 11A and 12A Westpoint Trade Centre , Carrigrohane , Ballincollig

168m
176519N/A29 Sept 2017

Retention of the change of use of a first floor area of unit 12A from trade warehouse/light industrial/service/distribution to a hair salon & associated ancillary areas.

Unit 12A Westpoint Trade Centre , Carrigrohane , Ballincollig

168m
176601REFUSED6 Oct 2017

Retention of the change of use of a first floor area of unit 12A from trade warehouse/light industrial/service/distribution to a hair salon & associated ancillary areas.

Unit 12A , Westpoint Trade Centre , Carrigrohane

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?