The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

24435

N/A

Clare - Clare County Council

Proposed Development

for the development at this site at the townlands of Ballycar, lislea, Kilulla, Mogullaan and Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare The development will consist of an application for a 10-year development phase followed by a 40-year operational lifespan for a solar farm on a site encompassing approximately 109 hectares. The proposed development includes the installation of ground-mounted solar photovoltaic (PV) panels on steel frames accross the site. The project will incorporate 256 inverters arranged in a series string configuration, supported by 24 electrical skid hardstands that will house transformer units and a ring main unit facility. The development also entails the construction of a transformer compound to facilitate a connection to the existing 110kV Drumline Substation. An internal network cable will be installed to enable an under-the-fence connection from the on-site transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18 metre-high lightning monopole mast. Approximately 8.6 Kilometres of new and upgraded internal access tracks will be developed to provide connectivity within the site. Six new site entrances are proposed, including modification to existing junctions to accommodate construction access and the delivery of abnormal loads. These access points will connnect to Local Roads (L3166, Ballycar Road L3174 and L3136) and the Regional Road R458. All new entrances will link directly to the public road network. This application seeks approval for all associated site development and ancillary works necessary to support the successful delivery and operation of the proposed solar farm. A Natura Impact Statement will also be submitted to the Planning Authority with this application

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2024

  2. Further information requested

    24 Feb 2025

  3. Application withdrawn

    19 Jun 2025

Application Details

Location
Ballycar Lislea Killulla , Mogullaan & Crossagh Rathlaheen South , Culleen Drumline & Ballycasey Beg Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
23 December 2024
Status
WITHDRAWN
Decision
N/A
Withdrawn
19 June 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

258m
2560551CONDITIONAL5 Sept 2025

for the change of use of existing detached garage to granny flat with disabled access including alterations to existing building, connection to existing services & all ancillary site works

Mogullaan , Newmarket on Fergus , Co. Clare

305m
2560355CONDITIONAL15 Jun 2025

to construct a granny flat to the rear of the existing dwelling along with any other ancillary works

Mogullaan , Newmarket-on-Fergus , Co. Clare V95 W271

335m
19589REFUSED18 Jul 2019

for development which will consist of a dwelling house with proprietary waste treatment system and sand polishing filter together with ancillary site works

Crossagh , Newmarket-on-Fergus , Co. Clare

436m
25260CONDITIONAL8 Aug 2025

for the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application

Mogullaan Crossagh , Rathlaheen South Culleen , Drumline and Ballycasey Beg Co. Clare

564m
211171N/A8 Nov 2021

to construct a new dwelling house, septic tank with percolation area and all associated site works

Crussagh , Newmarket on Fergus , Co Clare

564m
211296CONDITIONAL6 Dec 2021

to construct a new dwelling house, septic tank with percolation area and all associated site works

Crussagh , Newmarket-on-Fergus , Co Clare

921m
20712CONDITIONAL1 Oct 2020

the development consists of the construction of a slatted unit and associated site works

Culleen , Drumline , Co Clare

930m
21683CONDITIONAL30 Jun 2021

for an extension to dwelling house and carrying out of ancillary works

Killulla Stud , Killulla , Newmarket-on-Fergus Co Clare

964m
2660356CONDITIONAL30 May 2026

for the construction of an entrance, dwelling house, garage, driveway, advanced waste water treatment system together with all ancillary site development works and services

Culleen , Newmarket on Fergus , Co. Clare

965m
2460124CONDITIONAL21 Mar 2024

for the construction of an extension to rear of existing dwelling to include Kitchen/ Dining/ Living, Utility room, Hallway and 2 no En-suite Bedrooms, including renovation, internal alterations and elevational changes to Existing Dwelling. Permission is also sought for installation of a Waste Treatment Plant, Improvement of existing vehicular entrance & for the demolition of existing out-buildings, including all ancillary site works

Rathlaheen South , Newmarket on Fergus , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.