2450069
CONDITIONALDonegal - Donegal County Council
Proposed Development
ALTERATIONS TO THE SHOP FRONTAGE INCLUDING (1) NEW REPLACEMENT SHOPFRONT SIGNAGE, (2) INSTALLATION OF (A) A SECOND SHOPFRONT ENTRANCE AT THE SOUTHERN CANOPY LOCATION (B) NEW INTERNAL GLASS FIXED SIGNAGE, (C) INTERNALLY ILLUMINATED FASCIA PANELS, (D) AN INTERNAL SECURITY SHUTTER AND (3) ALL OTHER ASSOCIATED SHOPFRONT DEVELOPMENT WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
29 Feb 2024
Decision: CONDITIONAL
18 Apr 2024
Decision due
24 Apr 2024
Grant issued
22 May 2024
Application Details
- Location
- UNIT 11/12 LETTERKENNY RETAIL PARK (FORMERLY ARGOS) , PADDY HARTE ROAD , LETTERKENNY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.0954 ha
Timeline
- Registration Date
- 29 February 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 April 2024
- Grant Date
- 22 May 2024
- Permission Expires
- 21 May 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF (1) NEW MODULAR BUILDING TO CONSIST OF 2 NO. TEAM CHANGING ROOMS, SHOWER ROOMS AND TOILET FACILITIES AND (2) NEW MODULAR BUILDING TO CONSIST OF 2 NO. OFFICIALS CHANGING ROOMS, SHOWER ROOMS AND TOILET FACILITIES, CONNECTION TO ALL EXISTING MAIN PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKS TO INCREASE FOOTBALL PITCHES AND CLUB FACILITIES
LECKVIEW PARK , LECK , LETTERKENNY
REMOVAL OF EXISTING FENCING MATERIAL AND ERECTION OF NEW PERIMETER SECURITY FENCING TO SITE BOUNDARY OF EXISTING 'LECKVIEW PARK' FOOTBALL PITCHES SITE TO A HEIGHT OF 5 METRES AND ALL ASSOCIATED SITE WORKS TO INCREASE FOOTBALL PITCHES AND CLUB FACILITIES SECURITY AND SAFETY
LECKVIEW PARK , LECK , LETTERKENNY PO
ERECTION OF 4 NO. 18 METRE HIGH FLOODLIGHTS TO PERIMETER OF EXISTING GRASS PLAYING FOOTBALL PITCH, KNOWN LOCALLY AS 'LECKVIEW PARK' AND ALL ASSOCIATED SITE WORKS
LECKVIEW PARK , LECK , LETTERKENNY PO
(1) EXTENSIONS TO EXISTING INDOOR RECREATION CENTRE TO INCLUDE ACTIVITY ZONES, GLAZED LINK, BAR AREA, TOILETS AND COVERED SMOKING AREA, KITCHEN EXTENSION TO PROVIDE ADDITIONAL WORKS SPACE, STORAGE AND ALL ANCILLARY ACCOMMODATION, (2) ALL ASSOCIATED SITE WORKS TO INCLUDE SIGNAGE, REVISED CAR PARKING ARRANGEMENT AND RAINWATER HARVESTING SYSTEM (3) RETENTION PERMISSION FOR EXISTING KITCHEN EXTENSION
LECKVIEW LANE , LETTERKENNY , CO. DONEGAL
(1) ERECTION OF ROOF MOUNTED SOLAR PANELS TO BUILDING KNOWN AS CENTURY PLAY & CENTURY CINEMAS (2) REVISIONS TO EXTENSION TO THE INDOOR RECREATION CENTRE PREVIOUSLY APPROVED UNDER PLANNING REF: 17/51002 TO INCLUDE RAISING OF ROOF LEVEL TO ACCOMODATE ADDITIONAL FLOOR LEVEL STORAGE AREA AND ASSOCIATED ELEVATIONAL REVISIONS
LECKVIEW LANE , LETTERKENNY , LETTERKENNY PO
ERECTION OF ROOF MOUNTED PHOTOVOLTAIC PANELS TO THE EXISTING ROOF OF CENTURY PLAY COMPLEX AND ALL ASSOCIATED SITE WORKS. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
LECKVIEW LANE , LETTERKENNY , CO. DONEGAL
EXTENSION TO EXISTING BAR AREA FOR SHELTERED DINING AT BIDA'S CORNER BAR AND PERMISSION FOR (1) COMPLETION OF EXTENSION TO EXISTING INDOOR RECREATION CENTRE PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 17/51002 WITH MINOR ELEVATIONAL CHANGES AND (2) COMPLETION OF ALL ASSOCIATED SITE WORKS TO INCLUDE SIGNAGE, REVISED CAR PARKING ARRANGEMENT AND RAINWATER HARVESTING SYSTEM PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 17/51002
LECKVIEW LANE , LETTERKENNY PO , CO. DONEGAL
(1) THE PROVISION OF A MEZZANINE FLOOR WITH A GFA OF 383 SQ.M. THIS WILL RESULT IN THE TOTAL GFA OF UNIT 2 INCREASING FROM 2,003 SQ.M. TO 2,386 SQ.M (2) THE PROVISION OF 3 NO. NEW FIRE EXIT DOORS FOR THE UNIT: 1 NO. AT THE SIDE ENTRANCE WHICH FRONTS ONTO THE SIDE PASSAGE AND 2 NO. AT THE REAR (3) THE REMOVAL OF TWO EXISTING GLAZED SCREENS AT THE REAR OF THE UNIT WITH THE PROVISION OF AN AUTOMATED ROLLER SHUTTER DOOR TO ONE AND THE PROVISION OF CLADDING AND A NEW WINDOW AT GROUND FLOOR LEVEL TO THE OTHER (4) THE PROVISION OF INTERNALLY ILLUMINATED SIGNAGE ON THE FRONT ELEVATION
UNIT 2 PHASE 1 , LETTERKENNY RETAIL PARK , PADDY HARTE ROAD
CONSTRUCTION OF A NEW MEZZANINE FLOOR, EXTENDING G.F.L STOCK ROOM INTO EXISTING RETAIL AREA, CHANGE OF USE OF EXISTING G.F.L. STAFF AREAS TO STOCK ROOM, INTERNAL ALTERATINS, PROVISION OF NEW EXTERNAL SIGNAGE, ALL ANCILLARY WORKS AND SITE WORKS
UNIT 4 PHASE 1 , LETTERKENNY RETAIL PARK , PADDY HARTE ROAD LETTERKENNY
(1) RETENTION OF: (A) EXISTING AMALGAMATED UNITS NO’S 7, 8 & 9, (B) FIRST FLOOR MEZZANINE FLOOR, (C) MINOR ALTERATIONS TO EXTERNAL ELEVATIONS AND (D) MINOR INTERNAL ALTERATIONS AND (2) PROVISION OF ADDITIONAL MEZZAINE FLOOR IN UNIT NO. 6 ACCESSED FROM THE FIRST FLOOR OF UNIT NO. 7....”
UNIT678 AND 9 PEARSE ROAD RETAIL PARK , PEARSE ROAD , LETTERKENNY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?