The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460016

N/A

Clare - Clare County Council

Proposed Development

to construct a dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jan 2024

  2. Application withdrawn

    5 Jun 2024

  3. Decision due

    13 Jun 2024

Application Details

Location
Ballygirreen , Newmarket on Fergus , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.362 ha
Floor Area
297 sq m
Residential Units
1

Timeline

Registration Date
22 January 2024
Status
WITHDRAWN
Decision
N/A
Decision Due
13 June 2024
Withdrawn
5 June 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

25m
2560048CONDITIONAL6 Feb 2025

to construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services

Ballygirreen , Newmarket on Fergus , Co. Clare

174m
2560722CONDITIONAL23 Nov 2025

to construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works

Latoon South , Newmarket-On-Fergus , Co. Clare

664m
1810REFUSED11 Jan 2018

for the construction of a 30 metre telecommunications structure, carrying antennae and dishes within a 2.4 metre high palisade compound at the M18 Junction 11, Dromoland, Latoon South, Co. Clare

Dromoland , Latoon South , Co. Clare

705m
23370CONDITIONAL28 Jun 2023

for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works

Ballygirreen , Newmarket-on-Fergus , Co Clare

869m
21202CONDITIONAL8 Mar 2021

for development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works

No.1 Orchard Wood , Dromoland , Newmarket-on-Fergus Co Clare

878m
22739CONDITIONAL16 Aug 2022

of upper floor garage

12 Orchard Wood , Dromoland , Newmarket-on-Fergus Co Clare

1.2km
18627CONDITIONAL2 Aug 2018

for development which will consist of alterations and an extension to existing golf clubhouse building, to include a new retail area and an area for multi-uses, all associated to the existing clubhouse facilities including ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle Dromoland)

Dromoland Castle , Dromoland , Newmarket-on-Fergus

1.2km
18906CONDITIONAL12 Nov 2018

for development which will consist of an increase in the retail floor area, including minor changes to elevations, all to that granted under planning ref. 18-627. (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)

Dromoland Castle , Dromoland , Newmarket on Fergus

1.2km
221095CONDITIONAL5 Dec 2022

for development at Newmarket-on-Fergus Wastewater Treatment Plant in the townland of Boheraroan, Newmarket-on-Fergus, Co. Clare and an associated rising main traversing the townlands of Ballyconneely, Ballynacragga, Boheraroan, Dromoland, Latoon North, Latoon South, Manusmore, Newmarket and Rathfolan, County Clare. The development will compromise proposed works within the existing Newmarket-on-Fergus Wastewater Treatment Plant, including: a. 1 No. 7.8m high storm storage tank with minimum storage capacity of 516m3, measuring approximately 11m diameter. Between 3.6m - 5.0m will be above ground level, the remainder will be buried below ground level b. New below-ground discharge pumping station with associated below-ground valve chambers and wet well c. New 4.1m high tertiary treatment system (including 2 No. tertiary filter units and flocculation tank with a volume of 8m3) d. 2 No. 2.7m high chemical storage tanks (each with a volume of 7.5m3) e. Electrical control kiosk (6.4m L x 5.2m W x 2.5m H) f. Standby generator g. Diversion of the flows from the existing final effluent pump chamber via 110m of 300mm external diameter sewer to the new discharge pumping station. The proposed development will also include: h. Construction of approximately 4.4km of 400mm diameter outfall rising main from the proposed pumping station to the proposed outfall diffuser within the River Rine i. An outfall diffuser with three diffuser heads of 225mm diameter located within the River Rine foreshore j. All ancillary works site development works including site preparation works, hardstanding, site clearance, ground levelling and site drainage as required to facilitate the development. This application is accompanied by a Natura Impact Statement (NIS).

Boheraroan , Newmarket on Fergus , Co. Clare

1.2km
2560750CONDITIONAL2 Dec 2025

for development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement

Dromoland Castle and Estate , Dromoland , Newmarket-On-Fergus Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?