2460024

REFUSED

Longford - Longford County Council

Proposed Development

change of use of part of existing light industrial area to use as coffee shop/restaurant area changes to relevant elevations and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Feb 2024

  2. Decision: REFUSED

    26 Mar 2024

  3. Decision due

    3 Apr 2024

Application Details

Location
Unit 1 Athlone Road Industrial Estate , Creevagh Beg Ballymahon , Co. Longford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Longford County Council
Site Area
0.139 ha

Timeline

Registration Date
8 February 2024
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
26 March 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
2660051CONDITIONAL17 Feb 2026

to extend pitched roof over existing flat roof area at light industrial unit to include changes to relevant elevations and layout and all ancillary

Unit 1 Athlone Road Industrial Estate , Creevagh Beg , Ballymahon

30m
2096CONDITIONAL24 Apr 2020

the proposed construction of a single storey extension which will comprise a reception area together with relevant signage to service existing two storey building and all ancillary works

Milennium House , Athlone Road Industrial Estate , Ballymahon

60m
17129CONDITIONAL4 May 2017

proposed extension to front of existing unit to include changes to front elevation and relevant plans and all ancillary site works

Unit 3 Athlone Road Industrial Estate , Ballymahon , Co. Longford.

86m
18245CONDITIONAL31 Oct 2018

proposed construction of an extension to the rear of existing warehousing unit and all ancillary works

Unit 4 Creevaghbeg , Athlone Road , Ballymahon

110m
2359CONDITIONAL23 Mar 2023

the construction of a 242.00m2 single storey lean-to shed structure including all ancillary site works

Unit 5 , Ballymahon Business Park , Athlone Road

110m
21155CONDITIONAL25 May 2021

the proposed material alteration to the front façade to demolish partial structure & install a single use industrial roller door similar in design and colour to that of the existing including all ancillary site works

Unit 5 , Ballymahon Business Park , Athlone Road

139m
17128CONDITIONAL4 May 2017

extension to side of existing warehouse unit to include changes to relevant elevations and plans, amendments to site plan to include provision of access and parking and all ancillary site works

Unit 1 Athlone Road Industrial Estate , Ballymahon , Co. Longford.

239m
1960CONDITIONAL4 Mar 2019

construction of a bathroom to include level deck shower, doc M Pack W.C , grab Rails and ancillary works

7 Leo Casey Terrace , Athlone Road , Ballymahon

247m
2560086CONDITIONAL9 May 2025

10-year planning permission for proposed upgrade works and extension to the Ballymahon Wastewater Treatment Plant (WwTP) and local wastewater network. The proposed development comprises: (1) the refurbishment of existing final settlement tank, storm water tank, Return-Activated Sludge (RAS) and Waste-Activated Sludge (WAS) pumping station and 2 no. existing aeration tanks within the existing WwTP site; (2) an extension to the WwTP to include new inlet works with duty / standby combined screens and grit plant, odour control system, high-level emergency overflow chamber, Flow to Full Treatment (FFT) storm pumping station, stormwater storage tank, biological process units including 1 no. selector tank, 2 no. anoxic tanks, and 2 no. aeration tanks, 2 no. final settlement tanks with flow split chamber; (3) a new section of gravity sewer from the network pumping station serving Auburn Village residential estate to the new inlet works; (4) a new RAS / WAS pumping station with sludge holding capacity; sludge drying reedbeds (8 no. cells), return liquors pumping station, washwater pumping station, new chemical dosing plant, treated effluent outfall headwall to River Inny; (5) alterations to the existing entrance and a new internal road connecting the existing internal access road to the extension area; (6) surface water drainage interceptor, manholes and surface water attenuation tank; (7) ESB sub-station building, permanent generator and fuel tank, solar panels on block mounted frames; (8) decommissioning of picket fence thickener and associated dewatering equipment, ferric dosing tank, final effluent outfall chamber, complete with automatic sampler, and a redundant section of existing sewer network in the Auburn Village residential estate (all to remain in situ post decommissioning); (9) the decommissioning / removal of the existing inlet works and grit removal chamber; (10) decommissioning / demolition of pumping station in the Auburn Village residential estate; (11) site lighting (both task lighting and road lighting), boundary fencing and treatments including landscaping; (12) below ground interconnecting pipework; (13) and all ancillary site development and site excavation works above and below ground for the above referenced development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Ballymahon (Townland) , Co. Longford

261m
2360234CONDITIONAL20 Dec 2023

to construct a dwelling house, domestic garage with connection to public services and associated site works

Creevagh Beg , Ballymahon , Co.Longford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?