2460065

N/A

Clare - Clare County Council

Proposed Development

of an extension to the rear of the existing dwelling house and the stand alone garden room to the rear of the property

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Feb 2024

  2. Decision due

    16 Apr 2024

Application Details

Location
3 Circular Rd , Kilkee , Co Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council
Site Area
0.03 ha

Timeline

Registration Date
21 February 2024
Status
NEW APPLICATION
Decision
N/A
Decision Due
16 April 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
20659CONDITIONAL18 Sept 2020

to RETAIN existing gates (vehicular entrance) to rear garden of dwelling house including PERMISSION for dished kerbing to public road (Smith's Lane), at the rear of 13 Circular Road, Kilkee, Co Clare

13 Circular Road , Kilkee , Co Clare

33m
19116CONDITIONAL18 Feb 2019

for change of use of the first floor of building from childcare facility to enterprise office space along with all associated site works

Smyth's Lane , Kilkee , Co. Clare

46m
17387CONDITIONAL22 May 2017

to alter existing dwelling along with associated site works. The works involve a) converting the existing garage, contained within the dwelling structure, into a bedroom. b) to construct a new front porch c) to alter the front, right side and rear elevations by replacing/installing new windows and doors d) to alter the internal floor layout of the existing dwelling e) to construct a new front boundary wall.

Circular Rd , Kilkee , Co Clare

63m
2560446CONDITIONAL17 Jul 2025

for the following development (a) to change the use of part of the existing building from hair salon to private residential; (b) to demolish the existing rear extension; (c) to construct a new rear extension; (d) to make elevational changes to the existing building; (e ) all associated siteworks and services

Circular Road , Kilkee , Co. Clare

63m
2660478N/A23 Jul 2026

to demolish the existing sub-standard dwelling house and to construct a replacement dwelling house along with all associated site works and services

Circular Road , Kilkee , Co. Clare

70m
22341CONDITIONAL13 Apr 2022

of the conversion / change of use of the former outbuilding to the rear of the dwelling house to use as part of the dwelling house along with associated site works

Railway Road , Kilkee , Co Clare

73m
2660379N/A10 Jun 2026

to demolish the existing storage shed on the site and to construct a terrace of four no. townhouses along with all associated site works and services

Smiths Lane , Kilkee , Co. Clare

86m
26209N/A28 Jul 2026

to retain an extension (35.8m2) to the rear of the property

3 Hickey Terrace , O'Connell Street , Kilkee Co. Clare

87m
22342CONDITIONAL13 Apr 2022

of the following development (a) RETAIN the change of use of the existing building fronting O'Connell Street, from the guesthouse use previously authorised under planning permission ref no. P16/1016 to two no. townhouses, to include minor alterations to the front elevation of the building, revised internal layout and revised rear extension footprint & design; and (b) PERMISSION to construct a further two no. new townhouses to the rear of the subject site fronting Smiths Lane along with all associated ancillary site works and services

O'Connell St / Smiths Lane , Kilkee , Co Clare

90m
2560505CONDITIONAL16 Aug 2025

for development which will consist of the change of use from retail use to retail with ancillary use as an off licence and associated works

11 O'Connell Street , Kilkee , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.