2460067
CONDITIONALCarlow - Carlow County Council
Proposed Development
development at a site at the entrance to the Tullow Wastewater Treatment Plant, Bunclody Road (N81), Tullow, Co. Carlow, R93 RY69 measuring approximately 0.14 hectares. The development will consist of [1] the retention of the existing ‘as built’ wall to the north and south of the site entrance to the Tullow Wastewater Treatment Plant; [2] the demolition of part of the ‘as built’ southern wall, fence and hardstanding; [3] the construction of a new realigned section of wall, concrete hand standing and fence to tie in with the remainder of the ‘as built’ wall, footpath and fence; and [4] hard and soft landscaping works and other associated site development works above & below ground necessary to deliver the development
View the full application file on the council's planning portal →Application Timeline
Application received
21 Mar 2024
Decision: CONDITIONAL
10 May 2024
Decision due
15 May 2024
Grant issued
12 Jun 2024
Application Details
- Location
- A site at the entrance to the Tullow Wastewater Treatment Plant Bunclody Road (N81) , Tullow , Co. Carlow
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Carlow County Council
- Site Area
- 0.14 ha
Timeline
- Registration Date
- 21 March 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 May 2024
- Grant Date
- 12 June 2024
- Permission Expires
- 11 June 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development at a site entrance to the Tullow Wastewater Treatment Plant, measuring approximately 0.0605 hectares. The development will consist of works to improve the visibility splay at the ertrance to Tullow Wastewater Treatment Plant, including; demolition of the existing boundary fencing; construction of new retaining boundary walls and new boundary fencing and the provision of a new grass verge along the N81. The development will also consist of the: relocation of existing road signage; relocation of utility and light standard poles; all hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level and boundary treatments
Tullow Wastewater Treatment Plant , Bunclody Road (N81) , Tullow
the proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development.
Tullow Industrial Estate , Bunclody Rd Tullowbeg , Tullow
the proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development
Tullow Industrial Estate , Bunclody Rd Tullowbeg , Tullow
the construction of two separate commercial buildings including external signage. Block A will accommodate 4no units, each for light industrial/warehousing and ancillary office use on the ground floor. Unit 1 will have ancillary office use on the first floor. Block B will accommodate 3no units, each for light industrial/warehousing and ancillary office use on the ground floor. Unit 5 will have a mezzanine floor for light industrial/warehousing use. The development also includes landscaping, boundary treatments, site services and all associated site works above and below ground
Loughmartin Business Park , Tullow , Co. Carlow
the proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping
Loughmartin Business Park , Tullow , Co. Carlow
the proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping
Loughmartin Business Park , Tullow , Co. Carlow
the proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping
Loughmartin Business Park , Tullow , Carlow
retention permission for a new front boundary wall, vehicular entrance with off street parking and all associated site works
4 Templeowen , Tullow , Co. Carlow
for the proposed erection of a warehouse building including external signage and all auxiliary accommodation, the erection of paladin fencing to site boundaries including entrance gate together with all associated site works
Loughmartin Business Park , Tullow , Co. Carlow
for the proposed erection of a warehouse building including external signage and all auxiliary accommodation, the erection of paladin fencing to site boundaries including entrance gate together with all associated site works
Loughmartin Business Park , Tullow , Co. Carlow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?