The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460068

N/A

Tipperary - Tipperary County Council

Proposed Development

works already carried out to now existing hard surface area and all associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Feb 2024

  2. Further information requested

    21 Mar 2024

  3. Further information received

    11 Apr 2024

  4. Application withdrawn

    7 May 2024

  5. Decision due

    8 May 2024

Application Details

Location
Coole , Newport , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.083 ha

Timeline

Registration Date
1 February 2024
Status
WITHDRAWN
Decision
N/A
Decision Due
8 May 2024
Withdrawn
7 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
23254N/A26 Sept 2023

works already carried out to now existing hard surface area and all associated works

Coole , Newport , Co. Tipperary

70m
23125N/A9 May 2023

(a) completion of dwelling house previously built to all plate level, (b) extension to the rear of the dwelling, (c) septic tank and percolation area, (d) entrance gate and fence to the front, (e) boundary fencing to divide/separate sites and all associated works

Coole , Newport , Co. Tipperary

76m
2360911CONDITIONAL16 Nov 2023

a change of house design, change of garage design, change of site boundary and site layout plan from that granted in planning ref 20-759

Foildarrig , Newport , Co. Tipperary

90m
20730N/A9 Jul 2020

construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works

Foildarrig , Newport , Co. Tipperary

92m
17600432CONDITIONAL27 Apr 2017

(a) change of use from domestic garage to light industrial shed for the engraving of headstones and monuments, (b) 2 no. metal storage containers/tool sheds, (c) 2 no. temporary wooden clad portacabin offices, all in connection with the existing commercial yard

Newport Memorials , Coole , Newport

92m
20759CONDITIONAL13 Jul 2020

construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works

Foildarrig , Newport , Co. Tipperary

94m
19601098N/A7 Oct 2019

construction of new two storey house complete with a domestic garage, effluent treatment system and a new site entrance

Foildarrig , Newport , Co. Tipperary

117m
20755N/A13 Jul 2020

construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works

Foildarrig , Newport , Co. Tipperary

195m
19600124CONDITIONAL15 Feb 2019

two extensions to the rear of house, also to retain a domestic garage on site

Coole , Newport , Co Tipperary

256m
2144CONDITIONAL18 Jan 2021

demolition of existing single storey cottage (and outbuildings) and construction of a new single and part two storey dwelling house on the site, new single storey garage, new hard and soft landscaping, provision of a new foul water treatment system and percolation area, amendments to the existing site entrance and all ancillary site works

Coole , Newport , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?