2460083

N/A

Clare - Clare County Council

Proposed Development

to construct a boundary wall and entrance running parallel to the public road

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Feb 2024

  2. Further information requested

    22 Apr 2024

  3. Application withdrawn

    25 Feb 2025

Application Details

Location
Leighmaneigh More , Newmarket on Fergus , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.38 ha

Timeline

Registration Date
28 February 2024
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
25 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

48m
2560519CONDITIONAL25 Aug 2025

of a shed to the side of the dwelling house

Fairyfield Lemenagh More , Newmarket on Fergus , Co. Clare

165m
2560213CONDITIONAL25 Apr 2025

to construct a new dwelling house, domestic garage, and a wastewater treatment system with percolation area and soil polishing filter, along with a new vehicular entrance/exit to serve the proposed dwelling. The application will also include modifications to the existing entrance serving the existing cottage, connection to the public water supply, and all associated site development works and services necessary to facilitate the proposed development

Leamaneighmore , Newmarket on Fergus , Co. Clare

187m
20357CONDITIONAL4 Jun 2020

to construct a dwelling house, garage, wastewater treatment system and soil polishing filter together with all ancillary site development works and services

Leamaneigh More , Newmarket-on-Fergus , Co Clare

249m
17894CONDITIONAL23 Nov 2017

to RETAIN existing shed for storage purposes

Monument Cross , Ballinoosky , Newmarket-on-Fergus

289m
22250CONDITIONAL22 Mar 2022

to (a) Construct and extension to existing warehouse facility which will consist of offices, warehousing / distribution space along with sanitary and welfare facilities, (b) Construct increased parking and turning areas (c) Install new wastewater treatment system and soil polishing filter together with all associated site development works and services

Leamaneigh More , Newmarket on Fergus , Co Clare

304m
2360119CONDITIONAL20 Apr 2023

for the demolition of the existing substandard commercial unit and permission for the construction of a replacement commercial unit to comprise of packing area, storage area, offices, toilets with connection to existing septic tank, permission for the upgrading of existing entrance and car parking area and permission to RETAIN existing signage including ancillary site works

Ballinooskny , Newmarket-on-Fergus , Co. Clare

307m
2560588CONDITIONAL25 Sept 2025

of existing rear extension to existing dwelling house

Rowandene , Leamaneigh More , Newmarket on Fergus Co. Clare

332m
17753CONDITIONAL3 Oct 2017

for the construction of a slatted agricultural livestock unit, and all associated site works

Knocknagun , Newmarket-on-Fergus , Co. Clare

370m
21472CONDITIONAL14 May 2021

for the following 1. Replacement of existing rear extension with new two storey extension to rear and side, 2. new entrance gate, piers and parking area, including adjustment to existing boundary wall 3. minor modifications to existing elevations 4. demolition of single storey flat roof garage to side of dwelling 5. replace existing effluent with new effluent treatment system and percolation area 6. and all necessary site works and services

Leamaneigh More , Newmarket on Fergus , Co Clare

444m
17877N/A16 Nov 2017

to RETAIN the following as constructed: a) Front entrance porch, b) External chimney stack; c) Boiler House, d) Rear sun room; e) Garage; f) Shed and g) Site entrance, together with all associated site development works

Urlanbeg , Newmarket-on-Fergus , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?