The development will consist of: A 10-year permission for the development of a solar farm on a site of 35.81 hectares consisting of the following: 211,320 sqm of solar photovoltaic panels on ground mounted steel frames; 6 hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts ; a new access from the L6835 public road; access gates; landscaping and biodiversity enhancement measures; boundary fencing and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. Installation of underground electrical cabling and associated infrastructure within the public road corridor along the L6835 public road for approximately 10 metres to connect into the permitted underground cabling associated with the permitted ‘Milltown Solar Farm (Meath County Council Reg. Ref. 21396 & An Bord Pleanála Case Number: PL17.311460) which is located to the north of the site within the townland of Milltown. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Feb 2024

  2. Decision: CONDITIONAL

    19 Apr 2024

  3. Decision due

    21 Apr 2024

  4. Grant issued

    6 Jun 2024

Application Details

Location
The Townlands of Milltown and Cortown , near Kells , Co. Meath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Meath County Council
Site Area
35.81 ha

Timeline

Registration Date
26 February 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 April 2024
Grant Date
6 June 2024
Permission Expires
5 June 2034

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

429m
KA201226CONDITIONAL4 Sept 2020

construction of a part two storey part single storey dwelling, domestic garage, proprietary treatment unit and all ancillary site works

Milltown , Cortown , Kells Co. Meath

434m
KA200909N/A10 Jul 2020

construction of a part two storey part single storey dwelling, domestic garage, proprietary treatment unit and all ancillary site works

Milltown , Cortown , Kells

453m
2360305CONDITIONAL29 Sept 2023

to construct a single storey dwelling house, domestic garage, new entrance and install a sewage treatment system with percolation area together with all associated site development works on site at. Significant Further Information / Revised Plans received on this application.

Cortown , Kells , Co. Meath

454m
KA180882CONDITIONAL8 Aug 2018

construction of storey and half type dwelling, domestic garage, proprietary treatment unit and all ancillary site works

Milltown , Cortown , Kells Co. Meath

470m
KA181305CONDITIONAL2 Nov 2018

revised site boundaries and site layout from that previously granted under planning ref no. KA/180882

Milltown , Cortown , Kells Co. Meath

552m
2460194CONDITIONAL15 Mar 2024

permission to construct a single storey dwelling house, domestic garage, new entrance and install a sewage treatment system with percolation area together with all associated site development works on site

Cortown , Kells , Co. Meath

677m
22595CONDITIONAL9 May 2022

the development will consist of laying of underground 33kV medium voltage electrical cables with associated ducting, 4 no. joint bays, with associated communication chambers and ancillary development within the Local public roads L6835, L6836, and L80021 for a distance of approximately 2,991 metres. Permission is sought for a period of 10 years. The underground cable is intended to connect the South Parcel, in Moyagher Lower townland, with the North Parcel, in Milltown townland, of Milltown Solar Farm, which was permitted by An Bord Pleanala following appeal pursuant to An Bord Pleanala Reference number PL17.311460 and Meath County Council Planning Reference number 21/396. A Strategic infrastructure Development Application for the associated 110kV Substation was also permitted by An Bord Pleanala in the North Parcel of the permitted solar farm pursuant to An Bord Pleanala Reference number VA17.310029. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.

Balrathboyne Glebe Betaghstown , Cortown Milltown Moyagher Lower , Volvenstown Kells Co. Meath

849m
211033CONDITIONAL28 May 2021

the erection of a two-storey dwelling house, detached domestic garage and proprietary wastewater treatment system and percolation area. Also to provide a new entrance and to include for all ancillary site works. If successful this application will revoke permission KA170878 previously granted to the applicant. Significant further information/revised plans submitted on this application

Betaghstown , Cortown , Kells Co. Meath

993m
25199N/A24 Oct 2025

EXTENSION OF DURATION ON PLANNING REF KA200374: constructing a storey and a half type dwelling and a detached domestic garage, installing a proprietary waste water treatment unit and percolation area and to make a new entrance onto the road along with all ancillary site development works

Cortown , Kells , Co. Meath

1.0km
KA200374CONDITIONAL20 Mar 2020

constructing a storey and a half type dwelling and a detached domestic garage, installing a proprietary waste water treatment unit and percolation area and to make a new entrance onto the road along with all ancillary site development works

Cortown , Kells , Co. Meath

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?