2460154

CONDITIONAL

Galway - Galway County Council

Proposed Development

of domestic shed to rear of dwelling house. Gross floor space of work to be retained: 37.00 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Feb 2024

  2. Decision: CONDITIONAL

    5 Apr 2024

  3. Decision due

    10 Apr 2024

  4. Grant issued

    13 May 2024

Application Details

Location
Lisheenkyle East , Athenry , Co Galway
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.3 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
15 February 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 April 2024
Grant Date
13 May 2024
Permission Expires
12 May 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

513m
2660235CONDITIONAL16 Feb 2026

for internal and external alterations, including the construction of new side and rear extensions with associated modifications to the ground and first floor accommodation. Retention of second floor attic conversion, the works will also include revised window openings and elevation treatments, a new front porch, a rear patio area with pergola, and a new gym area to the rear of the existing garage incorporating new window and door openings and all associated site works

Lisheenkyle East , Athenry , Co. Galway

516m
191336N/A27 Aug 2019

for an existing granny flat. Gross floor space of work to be retained: 75 sqm

Ballyhugh ,

571m
19325CONDITIONAL7 Mar 2019

to refill an existing disused quarry with inert material

Barretts Park ,

703m
181883CONDITIONAL21 Dec 2018

for a ten-year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid and will be delivered in 4 no. phases. The development will consist of the construction and operation of up to 34 metal containers to store up to a project total of up to 100MW in sealed battery cells each with entrances, fire suppression systems, heating, ventilation and air conditioning systems. The proposed development includes for inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure. Gross floor space of proposed works: 2186.6 sqm

Barrettspark ,

762m
171246CONDITIONAL17 Aug 2017

to construct a new dwelling and garage, along with all associated site works and services including new treatment septic tank system & percolation area (gross floor space dwelling 248sqm; garage 54sqm)

Lisheenkyle East ,

762m
212239REFUSED29 Nov 2021

to construct a new dwelling and garage, along with all associated site works and services including new treatment septic tank system & percolation area (gross floor space dwelling 248sqm; garage 54sqm). Previously granted under 17/1276

Lisheenkyle East ,

768m
2260533CONDITIONAL24 May 2022

for the following; (1) Construction of a new detached dwelling house, (2) Domestic Garage and (3) proposed effluent treatment system and percolation area and all associated site works.

Lisheenkyle East , Athenry , Co. Galway

790m
221006CONDITIONAL26 Aug 2022

for the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare east of the existing ESB substation for the purpose of stabilizing the electricity grid will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (540 sqm c. 12m high); 5 No. modular containers to house electrical and control equipment (total area of c. 195 sqm, c. 5m high), a generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker (c. 8m); 1 No. firefighting water tank and pump, boundary fencing (c. 3m high) and CCTV, c. 50m of underground cabling ducts and cable to the neighbouring ESB Substation, all other ancillary site works including access roads and upgrade of existing local access road. Planning permission is being sought for a duration of 10 years. Gross floor space of proposed works: 540 sqm

Barrettspark ,

839m
22303REFUSED7 Mar 2022

for a development consisting of the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare east of the existing ESB substation for the purpose of stabilizing the electricity grid will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (540sqm c. 10m high). Cooling equipment (c. 160sqm, c. 3m high); 5 no. modular containers to house electrical and control equipment (total area of c. 195sqm, c. 5m high). A generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker (c. 8m); 1 no. firefighting water tank and pump, boundary fencing (c. 3m high) and CCTV, c. 50m of underground cabling ducts and cable to the neighbouring ESB Substation, all other ancillary site works including access roads. Planning permission is being sought for a duration of 10 years. Gross floor space of proposed works: 540sqm.

Barrettspark ,

883m
17279CONDITIONAL2 Mar 2017

permission to retain minor elevational changes to dwelling house and garage, from that granted under Planning Ref. 15/116.

Lisheenkyle ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?